Solving Fuzzy Job Shop Scheduling Problem Based on Interval Number Theory
暂无分享,去创建一个
Chuan He | Hao Guo | Dishan Qiu | Dishan Qiu | Hao Guo | Chuan He
[1] P. Luh,et al. Scheduling job shops with uncertainties , 1997, Proceedings of the 36th IEEE Conference on Decision and Control.
[2] Feng-Tse Lin. Fuzzy job-shop scheduling based on ranking level (λ, 1) interval-valued fuzzy numbers , 2002, IEEE Trans. Fuzzy Syst..
[3] Masatoshi Sakawa,et al. Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms , 2000, Eur. J. Oper. Res..
[4] Deming Lei,et al. Solving fuzzy job shop scheduling problems using random key genetic algorithm , 2010 .
[5] J. S. Chen,et al. Single-machine scheduling with flexible and periodic maintenance , 2006, J. Oper. Res. Soc..
[6] Tapan Kumar Pal,et al. On comparing interval numbers , 2000, Eur. J. Oper. Res..
[7] Mohammad Saidi-Mehrabad,et al. Flexible job shop scheduling with tabu search algorithms , 2007 .
[8] M. Sakawa,et al. An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate , 1999 .
[9] Der-Chiang Li,et al. Applying the fuzzy ranking method to the shifting bottleneck procedure to solve scheduling problems of uncertainty , 2006 .
[10] M. Saidi Mehrabad,et al. A fuzzy multi-objective programming for scheduling of weighted jobs on a single machine , 2009 .
[11] S. E. Kilic,et al. Job shop scheduling using fuzzy logic , 2004 .
[12] Emin Gundogar,et al. Fuzzy priority rule for job shop scheduling , 2004, J. Intell. Manuf..