Potassium topping cycles for stationary power
暂无分享,去创建一个
[1] J. A. Bond. The design of components for an advanced Rankine cycle test facility. , 1972 .
[2] J. A. Bond,et al. Vaporization of high-temperature potassium in forced convection at saturation temperatures of 1800 deg to 2100 deg F , 1967 .
[3] G. C. Wesling. Three-stage potassium turbine performance test summary , 1969 .
[4] R. J. Rossbach,et al. POTASSIUM TESTING OF CONDENSATE REMOVAL DEVICES FOR RANKINE SPACE POWER TURBINES. , 1971 .
[5] A. P. Fraas. A Potassium-Steam Binary Vapor Cycle for Better Fuel Economy and Reduced Thermal Pollution , 1973 .
[6] S. G. Sawochka. Thermal and hydraulic performance of potassium during condensation inside single tubes , 1967 .
[7] J. W. Mausteller,et al. Alkali metal handling and systems operating techniques : an AEC monograph , 1967 .
[8] E. Schnetzer. Two stage potassium turbine - 3000 hour test Final report , 1967 .
[9] R. J. Rossbach,et al. Two-stage potassium test turbine. Volume 1 - Fluid dynamic design and performance , 1968 .
[10] J. A. Bond,et al. Component and overall performance of an advanced Rankine cycle test rig , 1971 .