Building information modeling in construction conflict management

Dispute is recognized as critical cause of deficiency and low performance in construction projects. Plenty of studies have been done in construction dispute management recently; however, there are no studies on construction dispute elimination. This study aims to propose a building information modeling (BIM) approach to control conflict causes before the occurrence of dispute. BIM is one of the latest platforms that promote a high level of collaboration, information sharing, and coordination where its implementation ranges from project initialization to completion stage. The circumstances associating with BIM technology can be utilized to explore the possibilities in conflict and dispute resolution system. Questionnaire surveys are used to collect the primary data. Analytical hierarchy process (AHP) and multi attribute utility technique (MAUT) are adopted to develop an algorithm and a decision-making framework to manage and resolve the potential conflict causes, particularly for the Malaysian construction industry. Data analysis emerged that five critical conflict factors in Malaysian construction industry are insufficient monitoring of CPM scheduling and updates requirements; failures to understand and correctly bid or price the works; delay in running bill payment; inadequate contractors’ management, supervision, and coordination; and error and omission in design that are originated from time, cost, quality, and documentation. Further analysis to prioritize BIM functions in construction conflict management has been done by the combination of AHP and MAUT results. Consequently, it is affirmed that clash detection and cost estimating, 4D scheduling, 3D visualization and structure analysis as BIM functions obtained the highest score to control conflicting factors.

[1]  Suzila Mohd,et al.  Building information : modeling (BIM) roles in the Malaysian construction industry , 2014 .

[2]  Sai On Cheung,et al.  Are Construction Disputes Inevitable? , 2006, IEEE Transactions on Engineering Management.

[3]  Young Dai Lee,et al.  Conflicting factors in construction projects: Korean perspective , 2006 .

[4]  Jun Wang,et al.  A Comparative Review of Building Information Modelling Implementation in Building and Infrastructure Industries , 2015 .

[5]  David Lowe,et al.  Conflict and dispute in construction , 1997 .

[6]  V. Kasiulevičius,et al.  Sample size calculation in epidemiological studies , 2006 .

[7]  Wei-Chih Wang,et al.  Integrating building information models with construction process simulations for project scheduling support , 2014 .

[8]  Karsten Menzel,et al.  Multi-dimensional building performance data management for continuous commissioning , 2010, Adv. Eng. Informatics.

[9]  Oriol Pons,et al.  Improving the design and production data flow of a complex curvilinear geometric Glass Reinforced Concrete façade , 2014 .

[10]  Min-Yuan Cheng,et al.  Improving classification accuracy of project dispute resolution using hybrid artificial intelligence and support vector machine models , 2013, Expert Syst. Appl..

[11]  Sadi Assaf,et al.  Assessment of Work Performance of Maintenance Contractors in Saudi Arabia , 1996 .

[12]  Smita K. Patil,et al.  Decision support system for dispute resolution in construction contracts , 2012 .

[13]  Charles M. Eastman,et al.  Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules , 2013 .

[14]  Terje I. Vaaland,et al.  Improving project collaboration: start with the conflicts , 2004 .

[15]  Sigitas Mitkus,et al.  Causes of Conflicts in a Construction Industry: A Communicational Approach , 2014 .

[16]  Arazi Idrus,et al.  Analysis of Time and Cost Overrun in Malaysian Construction , 2012 .

[17]  M. Davidson Managing Conflict in Organizations , 2008, SSRN Electronic Journal.

[18]  Robert Frank Cushman,et al.  Alternative dispute resolution in the construction industry , 1991 .

[19]  Charles M. Eastman,et al.  Development of space database for automated building design review systems , 2012 .

[20]  Peter E.D. Love,et al.  Dispute causation: identification of pathogenic influences in construction. | NOVA. The University of Newcastle's Digital Repository , 2010 .

[21]  Mohammed Alias Yusof,et al.  INVESTIGATION ON THE CAUSES OF VARIATION ORDERS IN THE CONSTRUCTION OF BUILDING PROJECT – A STUDY IN THE STATE OF SELANGOR, MALAYSIA , 2010 .

[22]  Norngainy Mohd Tawil,et al.  Cause of construction delay - Theoretical framework , 2011 .

[23]  Zulhabri Ismail,et al.  INVESTIGATION OF ENHANCEMENT FACTORS FOR THE USAGE OF MEDIATION IN MALAYSIAN CONSTRUCTION INDUSTRY. , 2015 .

[24]  Nasir Shafiq,et al.  Prospects of Building Information Modeling (BIM) in Malaysian Construction Industry as Conflict Resolution Tool , 2013 .

[25]  Hamimah Adnan,et al.  A study of construction claim management problems in Malaysia , 2014 .

[26]  Ying Mei Cheng,et al.  Application of BIM on Quantity Estimate for Reinforced Concrete , 2013 .

[27]  Islam H. El-adaway,et al.  Multiagent System for Construction Dispute Resolution (MAS-COR) , 2010 .

[28]  Sai On Cheung,et al.  A Study of Styles and Outcomes in Construction Dispute Negotiation , 2006 .

[29]  Hussein Onn,et al.  Building Information Modeling (BIM) Application in Malaysian Construction Industry , 2013 .

[30]  Thomas L. Saaty,et al.  Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .

[31]  Jieh-Haur Chen,et al.  KNN based knowledge-sharing model for severe change order disputes in construction , 2008 .

[32]  Sai On Cheung,et al.  Logistic Likelihood Analysis of Mediation Outcomes , 2006 .

[33]  Paul R. Drake,et al.  Using the Analytic Hierarchy Process in Engineering Education , 1998 .

[34]  Burcu Akinci,et al.  Efficient and Effective Quality Assessment of As-Is Building Information Models and 3D Laser-Scanned Data , 2011 .

[35]  Zhiliang Ma,et al.  Semi-automatic and specification-compliant cost estimation for tendering of building projects based on IFC data of design model , 2013 .

[36]  David Arditi,et al.  Building Information Modeling (BIM) and the Construction Management Body of Knowledge , 2013, PLM.

[37]  Raja R. A. Issa,et al.  BIM-Enabled Building Commissioning and Handover , 2012 .

[38]  Andy P. Field,et al.  Discovering Statistics Using Ibm Spss Statistics , 2017 .

[39]  Chan-Sik Park,et al.  A framework for construction safety management and visualization system , 2013 .

[40]  Katherine A. Liapi,et al.  A parametric approach to the bioclimatic design of large scale projects: The case of a student housing complex , 2012 .

[41]  Ricardo Jardim-Goncalves,et al.  Challenging electronic procurement in the AEC sector: A BIM-based integrated perspective , 2011 .

[42]  Stephen O. Ogunlana,et al.  Conflict dynamics in a dam construction project: a case study , 2011 .

[43]  M. Kumaraswamy Conflicts, claims and disputes in construction , 1997 .

[44]  A. A. Elziny,et al.  An expert system to manage dispute resolutions in construction projects in Egypt , 2016 .

[45]  Ismail Abdul Rahman,et al.  Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia , 2012 .

[46]  Min-Yuan Cheng,et al.  Fuzzy case-based reasoning for coping with construction disputes , 2009, Expert Syst. Appl..

[47]  Burcu Akinci,et al.  Deviation analysis method for the assessment of the quality of the as-is Building Information Models generated from point cloud data , 2013 .

[48]  H. Kaiser An index of factorial simplicity , 1974 .

[49]  Javier Irizarry,et al.  Integrating BIM and GIS to improve the visual monitoring of construction supply chain management , 2013 .

[50]  David John. Yates Conflict and disputes in the Hong Kong construction industry: a transaction cost economics perspective , 1998 .

[51]  Henrik Gazdus,et al.  Kopitnari International Airport – Structure of Terminal Building – Design, Fabrication, Erection , 2013 .

[52]  Sushil Kumar,et al.  Analytic hierarchy process: An overview of applications , 2006, Eur. J. Oper. Res..

[53]  Chris Snijders,et al.  Dispute resolution and litigation in the construction industry. Evidence on conflicts and conflict resolution in The Netherlands and Germany , 2010 .

[54]  Chris Harty,et al.  Implementing ‘Site BIM’: A case study of ICT innovation on a large hospital project , 2013 .

[55]  Nancy L. Leech,et al.  SPSS for Introductory Statistics : Use and Interpretation, Second Edition , 2004 .

[56]  Terje I. Vaaland,et al.  Exploring interorganizational conflict in complex projects , 2003 .

[57]  Yu Cheng Lin,et al.  Enhancing Maintenance Management Using Building Information Modeling in Facilities Management , 2011 .

[58]  Farzad Khosrowshahi,et al.  Roadmap for implementation of BIM in the UK construction industry , 2012 .

[59]  Murat Gunduz,et al.  Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects. , 2013, Journal of safety research.

[60]  Uwe Rüppel,et al.  Designing a BIM-based serious game for fire safety evacuation simulations , 2011, Adv. Eng. Informatics.

[61]  Keith W. Hipel,et al.  Attitude-Based Strategic Negotiation for Conflict Management in Construction Projects , 2010 .

[62]  Sai On Cheung,et al.  A multi-attribute utility model for dispute resolution strategy selection , 2002 .

[63]  E. Brech Construction management in principle and practice , 1971 .