Hourly cooling load forecasting using time-indexed ARX models with two-stage weighted least squares regression

This paper presents a robust hourly cooling-load forecasting method based on time-indexed autoregressive with exogenous inputs (ARX) models, in which the coefficients are estimated through a two-stage weighted least squares regression. The prediction method includes a combination of two separate time-indexed ARX models to improve prediction accuracy of the cooling load over different forecasting periods. The two-stage weighted least-squares regression approach in this study is robust to outliers and suitable for fast and adaptive coefficient estimation. The proposed method is tested on a large-scale central cooling system in an academic institution. The numerical case studies show the proposed prediction method performs better than some ANN and ARX forecasting models for the given test data set. 2014 Elsevier Ltd. All rights reserved.

[1]  Pedro J. Mago,et al.  Building hourly thermal load prediction using an indexed ARX model , 2012 .

[2]  Daniel E. Fisher,et al.  EnergyPlus: creating a new-generation building energy simulation program , 2001 .

[3]  Weiwei Liu,et al.  An innovative air-conditioning load forecasting model based on RBF neural network and combined residual error correction , 2006 .

[4]  Harunori Yoshida,et al.  RATIONAL OPERATION OF A THERMAL STORAGE TANK WITH LOAD PREDICTION SCHEME BY ARX MODEL APPROACH , 1997 .

[5]  Gang Xu,et al.  Particle Swarm Optimization-based LS-SVM for Building Cooling Load Prediction , 2010, J. Comput..

[6]  Alberto Hernandez Neto,et al.  Comparison between detailed model simulation and artificial neural network for forecasting building energy consumption , 2008 .

[7]  Feng Zi-ping ARMAX Model of Ice-storage Air Conditioning System Load Based on Temperature Interval , 2009 .

[8]  M. El-Hawary,et al.  Load forecasting via suboptimal seasonal autoregressive models and iteratively reweighted least squares estimation , 1993 .

[9]  Jon Hand,et al.  CONTRASTING THE CAPABILITIES OF BUILDING ENERGY PERFORMANCE SIMULATION PROGRAMS , 2008 .

[10]  M. D. Mainar-Toledo,et al.  Multiple regression models to predict the annual energy consumption in the Spanish banking sector , 2012 .

[11]  Xinhua Xu,et al.  A grey‐box model of next‐day building thermal load prediction for energy‐efficient control , 2008 .

[12]  Ye Yao,et al.  Energy analysis on VAV system with different air-side economizers in China , 2010 .

[13]  Zhiqiang John Zhai,et al.  A simplified method to predict hourly building cooling load for urban energy planning , 2013 .

[14]  Saifur Rahman,et al.  Analysis and Evaluation of Five Short-Term Load Forecasting Techniques , 1989, IEEE Power Engineering Review.

[15]  Nicolai Bissantz,et al.  Convergence Analysis of Generalized Iteratively Reweighted Least Squares Algorithms on Convex Function Spaces , 2008, SIAM J. Optim..

[16]  Soteris A. Kalogirou,et al.  Applications of artificial neural-networks for energy systems , 2000 .

[17]  Ping-Feng Pai,et al.  Support Vector Machines with Simulated Annealing Algorithms in Electricity Load Forecasting , 2005 .

[18]  Frédéric Magoulès,et al.  A review on the prediction of building energy consumption , 2012 .

[19]  Jiejin Cai,et al.  Applying support vector machine to predict hourly cooling load in the building , 2009 .

[20]  Tin-Tai Chow,et al.  The use of occupancy space electrical power demand in building cooling load prediction , 2012 .

[21]  Alberto Cavazos,et al.  Neural, fuzzy and Grey-Box modelling for entry temperature prediction in a hot strip mill , 2012, Expert Syst. Appl..

[22]  Sheetal Kalyani,et al.  MSE Analysis of the Iteratively Reweighted Least Squares Algorithm when Applied to M Estimators , 2007, IEEE GLOBECOM 2007 - IEEE Global Telecommunications Conference.

[23]  Hong-Tzer Yang,et al.  Identification of ARMAX model for short term load forecasting: an evolutionary programming approach , 1995 .

[24]  M. E. El-Hawary,et al.  Short-term power system load forecasting using the iteratively reweighted least squares algorithm , 1990 .

[25]  William Dumouchel,et al.  Integrating a robust option into a multiple regression computing environment , 1992 .

[26]  R. Wolke,et al.  Iteratively Reweighted Least Squares: Algorithms, Convergence Analysis, and Numerical Comparisons , 1988 .

[27]  Jeonghan Ko,et al.  Cost optimization for a large-scale hybrid central cooling plant with multiple energy sources under a complex electricity cost structure , 2013 .

[28]  Joseph C. Lam,et al.  Multiple regression models for energy use in air-conditioned office buildings in different climates , 2010 .

[29]  Moncef Krarti,et al.  Development of a Predictive Optimal Controller for Thermal Energy Storage Systems , 1997 .

[30]  C. E. Dorgan,et al.  Hourly thermal load prediction for the next 24 hours by ARIMA, EWMA, LR and an artificial neural network , 1995 .

[31]  Jiejin Cai,et al.  Predicting hourly cooling load in the building: A comparison of support vector machine and different artificial neural networks , 2009 .

[32]  Zhiwei Lian,et al.  Hourly cooling load prediction by a combined forecasting model based on Analytic Hierarchy Process , 2004 .

[33]  P. Holland,et al.  Robust regression using iteratively reweighted least-squares , 1977 .

[34]  Jing Chen,et al.  Global optimization of a central air-conditioning system using decomposition-coordination method , 2010 .

[35]  Soteris A. Kalogirou,et al.  Use of TRNSYS for modelling and simulation of a hybrid pv–thermal solar system for Cyprus , 2001 .

[36]  W. J. Wepfer,et al.  Formulation of a load prediction algorithm for a large commercial building , 1984 .

[37]  D. O’Leary Robust regression computation computation using iteratively reweighted least squares , 1990 .

[38]  Abdullatif Ben-Nakhi,et al.  Cooling load prediction for buildings using general regression neural networks , 2004 .

[39]  Fu Xiao,et al.  Development and validation of a simplified online cooling load prediction strategy for a super high-rise building in Hong Kong , 2013 .

[40]  Shengwei Wang,et al.  Multiple ARMAX modeling scheme for forecasting air conditioning system performance , 2007 .

[41]  Greg Schoenau,et al.  Investigation of some large building energy conservation opportunities using the doe-2 model , 1999 .