A decomposition approach to flow control in tandem production systems
暂无分享,去创建一个
[1] Stanley B. Gershwin,et al. Manufacturing Systems Engineering , 1993 .
[2] Jian-Qiang Hu. Production rate control for failure-prone production systems with no backlog permitted , 1995 .
[3] Suresh P. Sethi,et al. Optimal feedback production planning in a stochastic two-machine flowshop , 1994 .
[4] Stanley B. Gershwin,et al. Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems , 1994 .
[5] Stanley B. Gershwin,et al. Scheduling manufacturing systems with work-in-process inventory control: single-part-type systems , 1995 .
[6] Houmin Yan,et al. Using stochastic optimization to determine threshold values for the control of unreliable manufacturing systems , 1994 .
[7] Panganamala Ramana Kumar,et al. Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems , 1988, Oper. Res..
[8] S. Gershwin,et al. PRODUCTION CONTROL FOR A TANDEM TWO-MACHINE SYSTEM , 1993 .