An analysis of multimodal transport routes for construction equipment in Vietnam

Design/methodology/approach: The basis of analysis is the application of a timecost-distance model which allows different routes to be compared directly. The paper is case-study based, using data supplied by logistics companies and their transport subcontractors. Data were collected through interviews and questionnaires. Routeing options for the movement of oversized construction equipment from southern to northern Vietnam are compared, and strengths and weaknesses within the respective supply chains identified.