Stochastic models for performance analysis of multistate flexible manufacturing cells

[1]  J. A. Buzacott,et al.  Models for Understanding Flexible Manufacturing Systems , 1980 .

[2]  B. L. Davies,et al.  The analysis of flexible manufacturing systems for reliability , 1986 .

[3]  J. Kaltwasser,et al.  Hierarchical Control of Flexible Manufacturing Systems , 1986 .

[4]  Mehmet Savsar,et al.  Stochastic modelling and comparisons of two flexible manufacturing cells with single and double gripper robots , 1993 .

[5]  Jiyin Liu,et al.  A new classification scheme for flexible manufacturing systems , 1993 .

[6]  Yeong-Dae Kim,et al.  Scheduling algorithms for flexible manufacturing systems with partially grouped machines , 1999 .

[7]  Ihsan Sabuncuoglu,et al.  Rescheduling frequency in an FMS with uncertain processing times and unreliable machines , 1999 .

[8]  H. Kaebernick,et al.  Cell formation and layout designs in a cellular manufacturing environment a case study , 2000 .

[9]  Mehmet Savsar Reliability analysis of a flexible manufacturing cell , 2000, Reliab. Eng. Syst. Saf..

[10]  Mehmet Savsar,et al.  A stochastic model for the analysis of a two-machine flexible manufacturing cell , 2005, Comput. Ind. Eng..

[11]  Mehmet Savsar Effects of maintenance policies on the productivity of flexible manufacturing cells , 2006 .

[12]  Oya Ekin Karasan,et al.  Scheduling , 2018, 2006 15th IEEE International Conference on High Performance Distributed Computing.

[13]  Yunfeng Wang,et al.  A genetic algorithm for cellular manufacturing design and layout , 2007, Eur. J. Oper. Res..

[14]  Mehmet Savsar Calculating production rate of a flexible manufacturing module , 2008 .

[15]  Mehmet Savsar,et al.  Modeling of machine failures in a flexible manufacturing cell with two machines served by a robot , 2008, Reliab. Eng. Syst. Saf..

[16]  M. Savsar,et al.  Modelling of multi-stage production lines with maintenance operations , 2008, Int. J. Comput. Integr. Manuf..

[17]  S. Balakrishnan,et al.  Fuzzy-based methodology for multi-objective scheduling in a robot-centered flexible manufacturing cell , 2008, J. Intell. Manuf..

[18]  Hong Chul Lee,et al.  The simulation design and analysis of a Flexible Manufacturing System with Automated Guided Vehicle System , 2009 .

[19]  José A. Ventura,et al.  Scheduling flexible manufacturing cells using Tabu Search , 2009 .

[20]  O. A. Joseph,et al.  Analysis of dynamic due-date assignment models in a flexible manufacturing system , 2011 .

[21]  Reza Tavakkoli-Moghaddam,et al.  A novel 0-1 linear integer programming model for dynamic machine-tool selection and operation allocation in a flexible manufacturing system , 2012 .

[22]  Chase C. Murray,et al.  An efficient local search heuristic for the double row layout problem with asymmetric material flow , 2013 .

[23]  Allan S. Tubaileh,et al.  Layout of flexible manufacturing systems based on kinematic constraints of the autonomous material handling system , 2014 .

[24]  MengChu Zhou,et al.  Optimal Supervisory Control of Flexible Manufacturing Systems by Petri Nets: A Set Classification Approach , 2014, IEEE Transactions on Automation Science and Engineering.

[25]  Alice E. Smith,et al.  Solving an Extended Double Row Layout Problem Using Multiobjective Tabu Search and Linear Programming , 2014, IEEE Transactions on Automation Science and Engineering.

[26]  V. Madhusudanan Pillai,et al.  A mathematical programming model for manufacturing cell formation to develop multiple configurations , 2014 .

[27]  Mohammad T. Khasawneh,et al.  Multimachine Flexible Manufacturing Cell Analysis Using a Markov Chain-Based Approach , 2015, IEEE Transactions on Components, Packaging and Manufacturing Technology.

[28]  Ahmed Azab,et al.  Modeling and scheduling a flexible manufacturing cell with parallel processing capability , 2015 .

[29]  Mustafa Göçken,et al.  Integration of genetic algorithm and Monte Carlo to analyze the effect of routing flexibility , 2015, The International Journal of Advanced Manufacturing Technology.

[30]  Philip Webb,et al.  Advanced flexible automation cell control for aerospace manufacturing , 2015 .

[31]  Murat Uzam,et al.  A divide-and-conquer-method for the synthesis of liveness enforcing supervisors for flexible manufacturing systems , 2016, J. Intell. Manuf..

[32]  Kathryn E. Stecke,et al.  Robot and machine scheduling with state-dependent part input sequencing in flexible manufacturing systems , 2016 .

[33]  Ye Chen,et al.  Flexible robotic manufacturing cell scheduling problem with multiple robots , 2016 .

[34]  Abdulrahman Al-Ahmari,et al.  Deadlock recovery for flexible manufacturing systems modeled with Petri nets , 2017, Inf. Sci..

[35]  N. Jawahar,et al.  An adjustable grouping genetic algorithm for the design of cellular manufacturing system integrating structural and operational parameters , 2017 .

[36]  László Monostori,et al.  Robust production planning and control for multi-stage systems with flexible final assembly lines , 2017, Int. J. Prod. Res..

[37]  Allan S. Tubaileh,et al.  Single and multi-row layout design for flexible manufacturing systems , 2017, Int. J. Comput. Integr. Manuf..

[38]  Xiaodong Zhang,et al.  Layout Optimization of Flexible Manufacturing Cells Based on Fuzzy Demand and Machine Flexibility , 2018 .

[39]  S. C. Jayswal,et al.  Evaluation of batching and layout on the performance of flexible manufacturing system , 2018, The International Journal of Advanced Manufacturing Technology.

[40]  Ton de Kok Modelling short-term manufacturing flexibility by human intervention and its impact on performance , 2018 .

[41]  Tangbin Xia,et al.  Imperfect preventive maintenance optimization for flexible flowshop manufacturing cells considering sequence-dependent group scheduling , 2018, Reliab. Eng. Syst. Saf..

[42]  Benoît Eynard,et al.  SME-oriented flexible design approach for robotic manufacturing systems , 2019, Journal of Manufacturing Systems.