Commissioning of the Control System for the LHC Beam Dump Kicker System
暂无分享,去创建一个
Kain | Jan Uythoven | N. Magnin | N Voumard | Brennan Goddard | E. Carlier | C Chanavat | A. Antoine
[1] Kain,et al. Experience with the LHC beam dump post-operational checks system , 2009 .
[2] A. Antoine,et al. DESIGN ASPECTS RELATED TO THE RELIABILITY OF THE CONTROL ARCHITECTURE OF THE LHC BEAM DUMP KICKER SYSTEMS , 2003 .
[3] Brennan Goddard,et al. RESULTS FROM THE LHC BEAM DUMP RELIABILITY RUN , 2007 .
[4] Jorg Wenninger,et al. Initial results from beam commissioning of the LHC beam dump system , 2009 .