An assignment-sequencing methodology for scheduling assembly and test operations with multi-pass requirements
暂无分享,去创建一个
Jonathan F. Bard | John Stuber | Zhufeng Gao | Rodolfo Chacon | J. Bard | J. Stuber | R. Chacon | Zhufeng Gao
[1] W. L. Pearna,et al. A case study on the multistage IC final testing scheduling problem with reentry , 2004 .
[2] Reha Uzsoy,et al. Decomposition algorithms for scheduling semiconductor testing facilities , 1995, Seventeenth IEEE/CPMT International Electronics Manufacturing Technology Symposium. 'Manufacturing Technologies - Present and Future'.
[3] Hark Hwang,et al. Production sequencing problem with reentrant work flows and sequence dependent setup times , 1997 .
[4] Chien-Min Lin,et al. A hybrid genetic algorithm for the re-entrant flow-shop scheduling problem , 2008, Expert Syst. Appl..
[5] Yeong-Dae Kim,et al. A Due-Date-Based Algorithm for Lot-Order Assignment in a Semiconductor Wafer Fabrication Facility , 2008, IEEE Transactions on Semiconductor Manufacturing.
[6] Yumin Deng,et al. Scheduling Back-End Operations in Semiconductor Manufacturing , 2010, IEEE Transactions on Semiconductor Manufacturing.
[7] Tae-Eog Lee,et al. Scheduling single-armed cluster tools with reentrant wafer flows , 2006, IEEE Transactions on Semiconductor Manufacturing.
[8] Brian Denton,et al. Optimization of surgery sequencing and scheduling decisions under uncertainty , 2007, Health care management science.
[9] Lin Danping,et al. A review of the research methodology for the re-entrant scheduling problem , 2011 .
[10] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[11] Reha Uzsoy,et al. Decomposition Methods for Complex Factory Scheduling Problems , 1996 .
[12] Joseph B. Mazzola,et al. Resource-Constrained Assignment Scheduling , 1986, Oper. Res..
[13] I. M. Ovacikt,et al. Rolling horizon algorithms for a single-machine dynamic scheduling problem with sequence-dependent setup times , 1994 .
[14] Reha Uzsoy,et al. Performance of decomposition methods for complex workshops under multiple criteria , 1997 .
[15] Ignacio E. Grossmann,et al. Assignment and sequencing models for thescheduling of process systems , 1998, Ann. Oper. Res..
[16] Jonathan F. Bard,et al. Daily scheduling of multi-pass lots at assembly and test facilities , 2013 .
[17] Jonathan F. Bard,et al. Equipment Selection and Machine Scheduling in General Mail Facilities , 1994 .
[18] Stephen C. Graves,et al. Scheduling of re-entrant flow shops , 1983 .
[19] Jen-Shiang Chen,et al. Hybrid tabu search for re-entrant permutation flow-shop scheduling problem , 2008, Expert Syst. Appl..
[20] Jonathan F. Bard,et al. The task assignment problem for unrestricted movement between workstation groups , 2006, J. Sched..
[21] Appa Iyer Sivakumar,et al. Job shop scheduling techniques in semiconductor manufacturing , 2006 .
[22] John W. Fowler,et al. A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations , 2011, J. Sched..