A fuzzy multicriteria generation expansion planning model

In this paper, we present a fuzzy multi-objective model for power generation expansion planning problem with uncertainty in objective functions and demand balance constraints. The purpose of the fuzzy generation expansion model is to determine the optimal generation amount in existing and new generation units and the optimal transmission network, given that decision maker may tolerate some violation in constraints and objective functions. A fuzzy linear programming approach is utilised to transform the multiobjective fuzzy generation expansion model into a linear program. To illustrate the proposed model, a Mexican electric power system case is studied. A comprehensive sensitivity analysis on the impact of different objective functions, environmental impact of different fuel types and changes in demand is done to illustrate the capability of the proposed model.

[1]  N. I. Voropai,et al.  Multi-criteria decision analysis techniques in electric power system expansion planning , 2002 .

[2]  S. Iniyan,et al.  A review of energy models , 2006 .

[3]  C. Hwang,et al.  Fuzzy Multiple Objective Decision Making: Methods And Applications , 1996 .

[4]  Eric Croiset,et al.  An environmentally conscious robust optimisation approach for planning power generating systems , 2009 .

[5]  Ian Lowe,et al.  Improving electricity planning — Use of a multicriteria decision making model☆ , 1996 .

[6]  S. Baskar,et al.  Application of NSGA-II Algorithm to Generation Expansion Planning , 2009, IEEE Transactions on Power Systems.

[7]  Young-Chang Kim,et al.  Multicriteria generation-expansion planning with global environmental considerations , 1993 .

[8]  Bin Chen,et al.  A MULTIOBJECTIVE APPROACH FOR INTEGRATED ENVIRONMENTAL ECONOMIC PLANNING UNDER UNCERTAINTY , 2000 .

[9]  João C. N. Clímaco,et al.  A multiple objective linear programming model for power generation expansion planning , 1995 .

[10]  Bruno Urli,et al.  PROMISE/scenarios: An interactive method for multiobjective stochastic linear programming under partial uncertainty , 2004, Eur. J. Oper. Res..

[11]  Masatoshi Sakawa,et al.  Interactive decision-making for multiobjective linear fractional programming problems with block angular structure involving fuzzy numbers , 1998, Fuzzy Sets Syst..

[12]  Mo-Yuen Chow,et al.  A review of emerging techniques on generation expansion planning , 1997 .

[13]  S. Frant,et al.  Methodology of power generation system planning: multicriteria optimization accounting for uncertainty factors , 1996, Proceedings of 19th Convention of Electrical and Electronics Engineers in Israel.

[14]  Jose L. Ceciliano Meza,et al.  A Model for the Multiperiod Multiobjective Power Generation Expansion Problem , 2007, IEEE Transactions on Power Systems.

[15]  S. Kannan,et al.  Application and comparison of metaheuristic techniques to generation expansion planning problem , 2005, IEEE Transactions on Power Systems.

[16]  Thomas L. Morin,et al.  Multiobjective Energy Generation Planning Under Uncertainty , 1982 .

[17]  A.K. Davis,et al.  An expert system with fuzzy sets for optimal planning , 1991, IEEE Power Engineering Review.

[18]  H. Zimmermann Fuzzy programming and linear programming with several objective functions , 1978 .

[19]  Mehmet Bayram Yildirim,et al.  A Multiobjective Evolutionary Programming Algorithm and Its Applications to Power Generation Expansion Planning , 2009, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.