Instream flow assessments for regulated rivers in South Africa using the Building Block Methodology
暂无分享,去创建一个
[1] C. Kleynhans. A qualitative procedure for the assessment of the habitat integrity status of the Luvuvhu River (Limpopo system, South Africa) , 1996 .
[2] Vladimir U. Smakhtin,et al. Development of an operating rule model to simulate time series of reservoir releases for instream flow requirements , 1997 .
[3] T. McMahon,et al. Variability of results from the use of PHABSIM in estimating habitat area , 1990 .
[4] A. Ferrar. Ecological flow requirements for South African rivers , 1989 .
[5] Dilip Mathur,et al. A critique of the instream flow incremental methodology , 1985 .
[6] C. S. Shirvell,et al. A Critique of the Instream Flow Incremental Methodology and Observations on Flow Determination in New Zealand , 1987 .
[7] Donald L. Tennant. Instream Flow Regimens for Fish, Wildlife, Recreation and Related Environmental Resources , 1976 .
[8] P. Rao,et al. Water supply and sanitation in India , 1990 .
[9] B. L. Lamb,et al. The Instream Flow Incremental Methodology: A Primer for IFIM. , 1995 .
[10] K. Gilman. Stream hydrology: An introduction for ecologists , 1993 .
[11] K. Rowntree,et al. A geomorphological framework for the assessment of instream flow requirements , 1998 .