Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain

On-site management of construction waste commonly determines its destination. In the case of plasterboard (PB), on-site segregation becomes crucial for closed-loop recycling. However, PB is commonly mixed with other wastes in Spain. In this context, the involvement of stakeholders that can contribute to reversing this current situation is needed. This paper analyzes on-site waste management of PB in Spain through a pilot study of a construction site, with the main objective of identifying best practices to increase waste prevention, waste minimization, and the recyclability of the waste. On-site visits and structured interviews were conducted. The results show five management stages: PB distribution (I); PB installation (II); Construction waste storage at the installation area (III); PB waste segregation at the installation area (IV) and PB waste transfer to the PB container and storage (V). The proposed practices refer to each stage and include the merging of Stages III and IV. This measure would avoid the mixing of waste fractions in Stage III, maximizing the recyclability of PB. In addition, two requisites for achieving enhanced management are analyzed: ‘Training and commitment’ and ‘fulfilling the requirements established by the current regulation’. The results show that foremen adopted a more pessimistic attitude than installers towards a joint commitment for waste management. Moreover, not all supervisors valued the importance of a site waste management plan, regulated by the Royal Decree 105/2008 in Spain.

[1]  Rawshan Ara Begum,et al.  Attitude and behavioral factors in waste management in the construction industry of Malaysia , 2009 .

[2]  Paola Villoria Sáez,et al.  Assessing the accumulation of construction waste generation during residential building construction works , 2014 .

[3]  Dieter Boer,et al.  An Inquiry into the Life Cycle of Systems of Inner Walls: Comparison of Masonry and Drywall , 2015 .

[4]  Jw Son,et al.  BIM-Integrated Construction Operation Simulation for Reliable Production Management , 2015 .

[5]  Laura Varela-Candamio,et al.  A Dynamic Model for Construction and Demolition (C , 2014 .

[6]  M Osmani,et al.  Architects' perspectives on construction waste reduction by design. , 2008, Waste management.

[7]  Lukumon O. Oyedele,et al.  Critical management practices influencing on-site waste minimization in construction projects. , 2017, Waste management.

[8]  Vivian W. Y Tam,et al.  Waste reduction through incentives: a case study , 2008 .

[9]  Dilanthi Amaratunga,et al.  Attitudes and perceptions of construction workforce on construction waste in Sri Lanka , 2006 .

[10]  June-Seong Yi,et al.  BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management , 2016 .

[11]  Justo Garcia Navarro,et al.  Life cycle energy and material flow implications of gypsum plasterboard recycling in the European Union , 2016 .

[12]  Weisheng Lu,et al.  Exploring critical success factors for waste management in construction projects of China , 2010 .

[13]  Ana Jiménez-Rivero,et al.  Exploring factors influencing post-consumer gypsum recycling and landfilling in the European Union , 2017 .

[14]  Ana Jiménez-Rivero,et al.  Indicators to Measure the Management Performance of End-of-Life Gypsum: From Deconstruction to Production of Recycled Gypsum , 2016 .

[15]  Paola Villoria Sáez,et al.  Best practice measures assessment for construction and demolition waste management in building constructions , 2013 .

[16]  Nuria Forcada,et al.  Analysis of the implementation of effective waste management practices in construction projects and sites , 2014 .

[17]  Matthew Dolan,et al.  Material waste in the Northern Ireland construction industry: on-site management causes and methods of prevention , 2014 .