Energy saving in cement clinker burning procedure

The paper analyzes the applicable methods of energy saving through comparisons of thermal procedure test between different clinker production lines with various process and scale:first, the new dry process should be adopted and the configuration of main auxiliary equipment and the enlargement of equipment is the key;secondly, production needs an optimized thermal control system;thirdly, enhance the system seal and utilize the waste heat.