Robust design for optimal project management with reliability and cost
暂无分享,去创建一个
[1] D Golenko Ginzburg,et al. RESOURCE SUPPORTABILITY MODEL FOR STOCHASTIC NETWORK PROJECTS UNDER A CHANCE CONSTRAINT , 2000 .
[2] Ehud Menipaz,et al. Three-parametrical harmonization model in project management by means of simulation , 2002, Math. Comput. Simul..
[3] D. Golenko-Ginzburg. On the Distribution of Activity Time in PERT , 1988 .
[4] Dimitri Golenko-Ginzburg,et al. A heuristic for network project scheduling with random activity durations depending on the resource allocation , 1998 .
[5] Douglas C. Montgomery,et al. Response Surface Methodology: Process and Product Optimization Using Designed Experiments , 1995 .
[6] Kailash C. Kapur,et al. Reliability in engineering design , 1977 .
[7] Sheldon M. Ross,et al. Stochastic Processes , 2018, Gauge Integral Structures for Stochastic Calculus and Quantum Electrodynamics.
[8] Dimitri Golenko-Ginzburg,et al. Hierarchical decision-making model for planning and controlling stochastic projects , 1996 .
[9] Raymond H. Myers,et al. Response surface methodology in quality improvement , 1991 .
[10] Ehud Menipaz,et al. Harmonization simulation model for managing several stochastic projects , 2002, Math. Comput. Simul..