Yield and performance analysis of the first grid-connected solar farm at Moshoeshoe I International Airport, Lesotho

The performance of a newly installed 281 kWp first grid-connected photovoltaic solar farm in Lesotho is evaluated against the basic parameters stated in the International Electro-Technical Commission (IEC) Standard 61724 and a number of other studies. The performance parameters selected are those that mainly indicate the suitability of a site for solar power development. Using normalised values, a brief comparison with other farms across the globe is made to assess the relative performance of the farm. The results show that its performance is satisfactory, with a weighted performance ratio of 0.70 compared to the global average of 0.70–0.80 for sufficiently well performing farms. However, the performance could be improved with improved operational monitoring of the farm. Additional performance parameters are assessed relative to the standard and the farms in other countries, such as capture and system losses, system efficiencies, and capacity factors, are above the thresholds for satisfactory performance. Measurements at the site show a high solar energy resource in the range of 4.0–7.2 kWh/m2/day. The results show that the area is suitable for grid connected photovoltaic systems.

[1]  Brian Norton,et al.  Long term performance analysis of a grid connected photovoltaic system in Northern Ireland , 2006 .

[2]  K. K. Gopinathan,et al.  A study on the intercepted insolation as a function of slope and azimuth of the surface , 2007 .

[3]  Ulrike Jahn,et al.  Operational performance of grid‐connected PV systems on buildings in Germany , 2004 .

[4]  K. K. Gopinathan,et al.  The potential of renewable energy technologies for rural development in Lesotho. , 2007 .

[5]  Mukund Patel,et al.  Wind and Solar Power Systems , 1999 .

[6]  Mariano Sidrach-de-Cardona,et al.  Performance analysis of a grid-connected photovoltaic system , 1999 .

[7]  S. M. Pietruszko,et al.  Performance of a grid connected small PV system in Poland , 2003 .

[8]  Hashim Hizam,et al.  A comparative study of three types of grid connected photovoltaic systems based on actual performance , 2014 .

[9]  Tebello Mathaba,et al.  Wind profile assessment at Masitise and Sani in Lesotho for potential off-grid electricity generation , 2012 .

[10]  Tebello Mathaba,et al.  Velocity and power density analysis of the wind at Letšeng-la-terae in Lesotho , 2012 .

[11]  R. Faranda,et al.  Performance Analysis of a Single-Axis Tracking PV System , 2012, IEEE Journal of Photovoltaics.

[12]  S. Arul Daniel,et al.  Performance analysis of a 3 MWp grid connected solar photovoltaic power plant in India , 2013 .

[13]  Girish Kumar Singh,et al.  Solar power generation by PV (photovoltaic) technology: A review , 2013 .

[14]  Amanpreet Kaur,et al.  Impact of onsite solar generation on system load demand forecast , 2013 .

[15]  Mariano Sidrach-de-Cardona,et al.  Evaluation of a grid-connected photovoltaic system in southern Spain , 1998 .

[16]  M. Bazilian,et al.  Contextualizing electricity access in sub-Saharan Africa , 2012 .

[17]  Filippo Spertino,et al.  Monitoring and checking of performance in photovoltaic plants: A tool for design, installation and maintenance of grid-connected systems , 2013 .

[18]  F. Dinçer,et al.  The analysis on photovoltaic electricity generation status, potential and policies of the leading countries in solar energy , 2011 .

[19]  Azah Mohamed,et al.  Power Quality Impact of Renewable Energy based Generators and Electric Vehicles on Distribution Systems , 2013 .

[20]  Somchai Chokmaviroj,et al.  Performance of a 500kWP grid connected photovoltaic system at Mae Hong Son Province, Thailand , 2006 .

[21]  Vasilis Fthenakis,et al.  Methodology Guidelines on Life Cycle Assessment of Photovoltaic Electricity 3rd Edition , 2016 .

[22]  Wenyuan Li,et al.  Reliability assessment of photovoltaic power systems: Review of current status and future perspectives , 2013 .

[23]  E. E. van Dyk,et al.  Long-term monitoring of photovoltaic devices , 2002 .

[24]  Jeyraj Selvaraj,et al.  Energy policy to promote photovoltaic generation , 2013 .

[25]  M. Gradzki,et al.  1-kW grid connected PV system after 3 years of monitoring , 2005, Conference Record of the Thirty-first IEEE Photovoltaic Specialists Conference, 2005..