Impact of Absenteeism on Assembly Line Quality and Throughput
暂无分享,去创建一个
[1] D. Kendall. Some Problems in the Theory of Queues , 1951 .
[2] J. A. Buzacott,et al. AUTOMATIC TRANSFER LINES WITH BUFFER STOCKS , 1967 .
[3] J. Buzacott. PREDICTION OF THE EFFICIENCY OF PRODUCTION SYSTEMS WITHOUT INTERNAL STORAGE , 1967 .
[4] Susanne M. Gatchell. The Effect of Part Proliferation on Assembly Line Operators' Decision Making Capabilities , 1979 .
[5] R. Mefford,et al. The Effect of Unions on Productivity in a Multinational Manufacturing Firm , 1986 .
[6] Yves Dallery,et al. An efficient algorithm for analysis of transfer lines with unreliable machines and finite buffers , 1988 .
[7] Tetsuya Takine,et al. Analysis of an M/G/1/K/N queue , 1993 .
[8] N. Oliver,et al. World Class Manufacturing: Further Evidence in the Lean Production Debate1 , 1994 .
[9] Tim Barmby,et al. Worker absenteeism: a discrete hazard model with bivariate heterogeneity , 2002 .
[10] Dennis E. Blumenfeld,et al. Designing production systems for quality: Research opportunities from an automotive industry perspective , 2003 .
[11] Dennis E. Blumenfeld,et al. An analytical formula for throughput of a production line with identical stations and random failures. , 2005 .
[12] Dennis E. Blumenfeld,et al. Quantitative analysis of a transfer production line with Andon , 2006 .
[13] R. Rindzevičius,et al. Performance Measures Analysis of M/M/m/K/N Systems with Finite Customer Population , 2006 .