Mechanization of static mechanical systems inspection planning process

Purpose – The purpose of this paper is to review the evolution of inspection and maintenance (I&M) practices used for aging and newly built oil and gas (O&G) facilities. It also proposes a framework and an approach for mechanizing inspection planning to perform preventive maintenance (PM) activities, taking technical condition (TC) and relative degradation (RD) into consideration. Design/methodology/approach – The paper systematically collects, categorizes, and analyzes the published literature of both researchers and practitioners. It also utilizes industrial experience that has been accrued and utilized from inspection planning practices for static mechanical equipment on aging O&G production plants. Findings – The paper defines significant issues in IM stakeholders’ requirements trade-off; dependability and asset deterioration challenges; items interacting with inspection planning mechanization processes and I&M optimization approaches. A framework is identified to mechanize the inspection planning process in order to reduce the effect arising from human involvement, while improving the effective utilization of data from different sources. The suggested approach improves the quality of an inspection program, while minimizing the variability and cost to the engineering contractors as well as to the owners of O&G facilities. Practical implications – The mechanization of inspection planning (MIP) is vital to have inspection programs with uniform quality. The currently employed inspection practices face challenges in maintaining uniform quality from one inspection program to another due to the variability present in the planning process, especially among the different inspection planning engineers. The suggested fuzzy logic-based MIP supports the minimization of the variability and increases the quality of inspection programs. Originality/value – The paper provides a comprehensive review of research contributions and industrial development efforts. These will be useful to the life cycle stakeholders in both academia and industry in understanding the inspection planning problem and solution space within the O&G asset I&M context.

[1]  R. M. Chandima Ratnayake,et al.  Maintaining Technical Integrity of Petroleum Flowlines on Offshore Installations: A Decision Support System for Inspection Planning , 2010 .

[2]  R. M. Chandima Ratnayake,et al.  KBE development for criticality classification of mechanical equipment: a fuzzy expert system , 2014 .

[3]  Fang Lee Cooke Plant maintenance strategy: evidence from four British manufacturing firms , 2003 .

[4]  A. M. N. D. B. Seneviratne,et al.  Improving degradation prediction models for failure analysis in topside piping: A neuro-fuzzy approach , 2014, IEEE 18th International Conference on Intelligent Engineering Systems INES 2014.

[5]  James T. Luxhoj,et al.  Reliability curve fitting for aging helicopter components , 1995 .

[6]  Kurt Hornik,et al.  Multilayer feedforward networks are universal approximators , 1989, Neural Networks.

[7]  J Maiti,et al.  Risk-based maintenance--techniques and applications. , 2007, Journal of hazardous materials.

[8]  Chee Peng Lim,et al.  On the use of fuzzy inference techniques in assessment models: part II: industrial applications , 2008, Fuzzy Optim. Decis. Mak..

[9]  R. M. Chandima Ratnayake,et al.  Inspection Interval Estimation: A Fuzzy Logic Based RBI Analysis Approach , 2014, APMS.

[10]  Daniel Straub,et al.  Risk based inspection planning for structural systems , 2005 .

[11]  Faisal Khan,et al.  Risk‐based maintenance (RBM): A new approach for process plant inspection and maintenance , 2004 .

[12]  A. N. Shabalin Generation of models for reliability growth , 1992, Annual Reliability and Maintainability Symposium 1992 Proceedings.

[13]  C Pedersen,et al.  RELIABILITY BASED INSPECTION PLANNING FOR THE TYRA FIELD , 1992 .

[14]  Hongzhou Wang,et al.  A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..

[15]  Yasuhiro Hayashi,et al.  An algorithm for thermal unit maintenance scheduling through combined use of GA, SA and TS , 1997 .

[16]  A. M. N. D. B. Seneviratne,et al.  In-service inspection of static mechanical equipment: Use of a fuzzy inference system for maintaining the quality of an inspection program , 2013, 2013 IEEE International Conference on Industrial Engineering and Engineering Management.

[17]  R. M. Chandima Ratnayake,et al.  Application of a fuzzy inference system for functional failure risk rank estimation: RBM of rotating equipment and instrumentation , 2014 .

[18]  Mark A. Kramer,et al.  A general framework for preventive maintenance optimization in chemical process operations , 1997 .

[19]  Faisal Khan,et al.  Development of a risk-based maintenance (RBM) strategy for a power-generating plant , 2005 .

[20]  P. A. Frieze,et al.  An expert system for offshore structure inspection and maintenance , 1991 .

[21]  Jezdimir Knezevic,et al.  Reliability modelling of repairable systems using Petri nets and fuzzy Lambda-Tau methodology , 2001, Reliab. Eng. Syst. Saf..

[22]  J. Vaurio Optimization of test and maintenance intervals based on risk and cost , 1995 .

[23]  Yun Li,et al.  Risk-based maintenance strategy and its applications in a petrochemical reforming reaction system , 2009 .

[24]  G. S. Sekhon,et al.  An artificial neural network for modeling reliability, availability and maintainability of a repairable system , 2006, Reliab. Eng. Syst. Saf..

[25]  Madan G. Singh,et al.  Reliability of computer and control systems , 1987 .

[26]  Amir Khanlari,et al.  Prioritizing equipments for preventive maintenance (PM) activities using fuzzy rules , 2008, Comput. Ind. Eng..

[27]  Faisal I Khan,et al.  Risk-based maintenance of ethylene oxide production facilities. , 2004, Journal of hazardous materials.

[28]  Faisal I Khan,et al.  Risk-Based Integrity and Inspection Modeling (RBIIM) of Process Components/System , 2006, Risk analysis : an official publication of the Society for Risk Analysis.

[29]  Kostas Kalaitzakis,et al.  A fuzzy knowledge based method for maintenance planning in a power system , 2002, Reliab. Eng. Syst. Saf..

[30]  Nelson F. F. Ebecken,et al.  In-time fatigue monitoring using neural networks , 1997 .

[31]  Charles E Ebeling,et al.  An Introduction to Reliability and Maintainability Engineering , 1996 .

[32]  Nancy G. Leveson,et al.  Safety Analysis Using Petri Nets , 1987, IEEE Transactions on Software Engineering.

[33]  Palle Thoft-Christensen,et al.  Optimal strategy for inspection and repair of structural systems , 1987 .

[34]  Anish Sachdeva,et al.  Planning and optimizing the maintenance of paper production systems in a paper plant , 2008, Comput. Ind. Eng..

[35]  Maneesh Singh,et al.  A methodology for risk-based inspection planning of oil and gas pipes based on fuzzy logic framework , 2009 .

[36]  R. Petrovic,et al.  Optimal preventive maintenance scheduling of thermal generating units in power systems: a survey of problem formulations and solution methods , 1988 .

[37]  Enrico Zio,et al.  Neural network approach to sensitivity and uncertainty analysis , 1999 .

[38]  Enrico Zio,et al.  Optimizing maintenance and repair policies via a combination of genetic algorithms and Monte Carlo simulation , 2000, Reliab. Eng. Syst. Saf..

[39]  Andres Ramos,et al.  Goal programming approach to maintenance scheduling of generating units in large scale power systems , 1999 .

[40]  K. K. Aggarwal,et al.  Petri Net modelling and reliability evaluation of distributed processing systems , 1993 .

[41]  David Sherwin,et al.  A review of overall models for maintenance management , 2000 .

[42]  Dorota Stadnicka,et al.  Development of an empirical formula for machine classification: Prioritization of maintenance tasks , 2014 .

[43]  Faisal Khan,et al.  Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning , 2003 .

[44]  R. M. Chandima Ratnayake,et al.  Maintenance Integrity: Managing Flange Inspections on Aging Offshore Production Facilities , 2011 .

[45]  Terje Aven,et al.  Risk based maintenance optimization: foundational issues , 2000, Reliab. Eng. Syst. Saf..

[46]  R. M. Chandima Ratnayake,et al.  Technical integrity management: measuring HSE awareness using AHP in selecting a maintenance strategy , 2010 .

[47]  J. Moubray Reliability-centred maintenance , 1995 .

[48]  R. M. Chandima Ratnayake,et al.  A decision model for executing plant strategy: maintaining the technical integrity of petroleum flowlines , 2012 .

[49]  R. M. Chandima Ratnayake,et al.  Sustainable performance of industrial assets: the role of PAS 55-1&2 and human factors , 2013 .