Technical update of the CHARA array

The CHARA array achieved first fringes late last year and is currently being expanded on Mount Wilson CA. This presentation is a follow on from the overview given by Hal McAlister and will give more technical detail on the optical systems, with a focus on the telescopes, the delay lines, the control system, and the beam combining scheme. Combining more than three beams is not a simple problem with no obvious best solution, and we have by no means locked ourselves into a particular design. Preliminary designs will be shown, the first beam combiner will also be discussed along with our plans for future development.

[1]  Braden E. Hines,et al.  Common interferometer control systems architecture , 1998, Astronomical Telescopes and Instrumentation.

[2]  Benjamin F. Lane,et al.  Palomar Testbed Interferometer: update , 2000, Astronomical Telescopes and Instrumentation.

[3]  R. A. Minard,et al.  An Overview of the Susi Control System , 1994 .

[4]  Theo A. ten Brummelaar,et al.  CHARA beam combiner design , 1994, Astronomical Telescopes and Instrumentation.

[5]  John Davis,et al.  MEASUREMENT OF THE ATMOSPHERIC COHERENCE TIME , 1996 .

[6]  Peter R. Lawson,et al.  Group-delay tracking in optical stellar interferometry with the fast Fourier transform , 1995 .

[7]  Harold A. McAlister,et al.  Automated telescope enclosure for the CHARA array , 2000, Astronomical Telescopes + Instrumentation.

[8]  Laszlo Sturmann,et al.  Optical telescopes and enclosures for ground-based interferometry: the CHARA array , 1998, Astronomical Telescopes and Instrumentation.