An iterated greedy algorithm for solving the total tardiness parallel blocking flow shop scheduling problem
暂无分享,去创建一个
[1] Marcelo Seido Nagano,et al. A branch-and-bound method to minimize the makespan in a permutation flow shop with blocking and setup times , 2017 .
[2] Imma Ribas,et al. Efficient heuristic algorithms for the blocking flow shop scheduling problem with total flow time minimization , 2015, Comput. Ind. Eng..
[3] Débora P. Ronconi,et al. Lower bounding schemes for flowshops with blocking in-process , 2001, J. Oper. Res. Soc..
[4] Imma Ribas,et al. Improvement Tools for NEH Based Heuristics on Permutation and Blocking Flow Shop Scheduling Problems , 2009, APMS.
[5] Joaquín Bautista,et al. Solving the Fm∣block∣Cmax problem using Bounded Dynamic Programming , 2012, Eng. Appl. Artif. Intell..
[6] Reza Tavakkoli-Moghaddam,et al. A memetic algorithm for the flexible flow line scheduling problem with processor blocking , 2009, Comput. Oper. Res..
[7] Yazid Mati,et al. Complexity of flowshop scheduling problems with a new blocking constraint , 2003, Eur. J. Oper. Res..
[8] Shih-Wei Lin,et al. Minimising makespan in distributed permutation flowshops using a modified iterated greedy algorithm , 2013 .
[9] Imma Ribas,et al. An iterated greedy algorithm for the flowshop scheduling problem with blocking , 2011 .
[10] Éric D. Taillard,et al. Benchmarks for basic scheduling problems , 1993 .
[11] Rubén Ruiz,et al. A scatter search algorithm for the distributed permutation flowshop scheduling problem , 2014, Eur. J. Oper. Res..
[12] J. Framiñan,et al. A bounded-search iterated greedy algorithm for the distributed permutation flowshop scheduling problem , 2015 .
[13] Mehmet Fatih Tasgetiren,et al. A hybrid harmony search algorithm for the blocking permutation flow shop scheduling problem , 2011, Comput. Ind. Eng..
[14] Min Liu,et al. A High Performing Memetic Algorithm for the Flowshop Scheduling Problem With Blocking , 2013, IEEE Transactions on Automation Science and Engineering.
[15] Débora P. Ronconi,et al. Some heuristic algorithms for total tardiness minimization in a flowshop with blocking , 2009 .
[16] Rong Chen,et al. A Knowledge-based Genetic Algorithm for Permutation Flowshop Scheduling Problems with Multiple Factories , 2012 .
[17] Immaculada Ribas Vila,et al. A New Constructive Heuristic for the Fm|block|ΣT , 2014 .
[18] Cheng Wang,et al. A three-phase algorithm for flowshop scheduling with blocking to minimize makespan , 2012, Comput. Oper. Res..
[19] Xavier Tort-Martorell,et al. An efficient Discrete Artificial Bee Colony algorithm for the blocking flow shop problem with total flowtime minimization , 2015, Expert Syst. Appl..
[20] George L. Vairaktarakis,et al. The use of flowlines to simplify routing complexity in two-stage flowshops , 2000 .
[21] Xavier Tort-Martorell,et al. Efficient heuristics for the parallel blocking flow shop scheduling problem , 2017, Expert Syst. Appl..
[22] Liang Gao,et al. A Discrete Electromagnetism-Like Mechanism Algorithm for Solving Distributed Permutation Flowshop Scheduling Problem , 2010, 2010 International Conference on Manufacturing Automation.
[23] Mingyuan Chen,et al. Parallel flowshop scheduling using Tabu search , 2003 .
[24] Sidney Addelman,et al. trans-Dimethanolbis(1,1,1-trifluoro-5,5-dimethylhexane-2,4-dionato)zinc(II) , 2008, Acta crystallographica. Section E, Structure reports online.
[25] Manuel Mateo,et al. Different behaviour of a double branch-and-bound algorithm on Fm|prmu|Cmax and Fm|block|Cmax problems , 2007, Comput. Oper. Res..
[26] Wieslaw Kubiak,et al. Sequencing of parts and robot moves in a robotic cell , 1992 .
[27] Imma Ribas,et al. A competitive variable neighbourhood search algorithm for the blocking flow shop problem , 2013 .
[28] Débora P. Ronconi,et al. A Branch-and-Bound Algorithm to Minimize the Makespan in a Flowshop with Blocking , 2005, Ann. Oper. Res..
[29] Ling Wang,et al. An effective hybrid immune algorithm for solving the distributed permutation flow-shop scheduling problem , 2014 .
[30] Jian Gao,et al. An efficient tabu search algorithm for the distributed permutation flowshop scheduling problem , 2013 .
[31] Steef L. van de Velde,et al. Approximation algorithms for the parallel flow shop problem , 2012, Eur. J. Oper. Res..
[32] Tapan P. Bagchi,et al. Minimizing makespan in a blocking flowshop using genetic algorithms , 2001 .
[33] Rubén Ruiz,et al. The distributed permutation flowshop scheduling problem , 2010, Comput. Oper. Res..
[34] Ling Wang,et al. Effective heuristics for the blocking flowshop scheduling problem with makespan minimization , 2012 .
[35] Ponnuthurai N. Suganthan,et al. A novel hybrid discrete differential evolution algorithm for blocking flow shop scheduling problems , 2010, Comput. Oper. Res..
[36] Ling Wang,et al. Solving the blocking flow shop scheduling problem by a dynamic multi-swarm particle swarm optimizer , 2011 .
[37] Quan-Ke Pan,et al. Iterated Greedy methods for the distributed permutation flowshop scheduling problem , 2019, Omega.
[38] Marcelo Seido Nagano,et al. An evolutionary clustering search for the total tardiness blocking flow shop problem , 2017, Journal of Intelligent Manufacturing.
[39] Chris N. Potts,et al. A decomposition algorithm for the single machine total tardiness problem , 1982, Oper. Res. Lett..
[40] Jing J. Liang,et al. Effective hybrid discrete artificial bee colony algorithms for the total flowtime minimization in the blocking flowshop problem , 2013 .
[41] Marcelo Seido Nagano,et al. Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times , 2019, International Journal of Industrial Engineering Computations.
[42] Lixin Tang,et al. A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times , 2010, Comput. Oper. Res..
[43] Débora P. Ronconi,et al. A note on constructive heuristics for the flowshop problem with blocking , 2004 .
[44] Ling Wang,et al. An effective estimation of distribution algorithm for solving the distributed permutation flow-shop scheduling problem , 2013 .
[45] A. Kusiak,et al. A scheduling problem in glass manufacturing , 1996 .