Measuring Public Transport Connectivity Performance Applied in Auckland, New Zealand

Bus and other public transit connectivity issues facilitate an understanding of the importance of transit planning in enhancing existing or new transit services. Improving transit connectivity is a vital task in transit operations planning. Passengers may stop using a transit service because of poor connections. Service design criteria always contain postulates to improve routing and scheduling coordination (intra- and interagency transfer centers or points and synchronized or timed transfers). Ostensibly, the lack of well-defined connectivity measures precludes weighing and quantifying the results of any coordination effort. A methodological framework and concepts are provided for quantifying transit connectivity measures. These new measures are applied in a case study of the Auckland, New Zealand, public transit network for possible revisions and changes.

[1]  Paul Schonfeld,et al.  OPTIMAL SLACK TIME FOR TIMED TRANSFERS AT A TRANSIT TERMINAL , 1991 .

[2]  Hani S. Mahmassani,et al.  Planning and Design Model for Transit Route Networks with Coordinated Operations , 1998 .

[3]  Avishai Ceder,et al.  Public Transit Planning and Operation: Theory, Modeling and Practice , 2007 .

[4]  Ross R. Maxwell,et al.  Intercity Rail Fixed-Interval, Timed-Transfer, Multihub System: Applicability of the Integraler Taktfahrplan Strategy to North America , 1999 .

[5]  Avishai Ceder,et al.  Designing Synchronization into Bus Timetables , 2001 .

[6]  Randolph W. Hall,et al.  Vehicle Scheduling at a Transportation Terminal with Random Delay en Route , 1985, Transp. Sci..

[7]  Jean-Marc Rousseau,et al.  SYNCRO: A Computer-Assisted Tool for the Synchronization of Transfers in Public Transit Networks , 1992 .

[8]  Frank Spielberg,et al.  Implementation of a Timed Transfer Network at Norfolk, Virginia , 1999 .

[9]  Wolfgang Domschke,et al.  Schedule synchronization for public transit networks , 1989 .

[10]  Stefan Voß,et al.  Practical Experiences in Schedule Synchronization , 1995 .

[11]  Avishai Ceder,et al.  Public Transit Planning and Operation , 2007 .

[12]  Wojciech Chmiel,et al.  Optimal Service Synchronization in Public Transport , 1997 .

[13]  Mark D. Abkowitz,et al.  Operational Feasibility of Timed Transfer in Transit Systems , 1987 .

[14]  R Clever,et al.  INTEGRATED TIMED TRANSFER: A EUROPEAN PERSPECTIVE , 1997 .

[15]  Stefan Voß Network Design Formulations in Schedule Synchronization , 1992 .

[16]  Boaz Golany,et al.  Creating bus timetables with maximal synchronization , 2001 .