Evaluation of the mining projects under economic uncertainties using multidimensional binomial tree

Nowadays, economic uncertainties have an indispensable role in mining evaluation projects, so the evaluation of a mining project without considering if the available uncertainties are incorrect and unreliable. Metal price uncertainty and operating costs uncertainty are the most important parameters in economic uncertainty. Numerous research studies have been carried out for price uncertainty, but there is no noticeable research on the simultaneous effects of operating cost and price uncertainties on the evaluation process. To solve this problem, a new evaluation method – pyramid technique – was developed based on the multidimensional binomial tree method. The pyramid technique can evaluate the mining projects under the situation of multi-uncertainties.

[1]  Ilya M. Sobol,et al.  A Primer for the Monte Carlo Method , 1994 .

[2]  S. A. Abdel Sabour,et al.  Valuing Real Capital Investments Using The Least-Squares Monte Carlo Method , 2006 .

[3]  Simone Kelly,et al.  A binomial lattice approach for valuing a mining property IPO , 1998 .

[4]  Hesam Dehghani,et al.  The Role of Economic Uncertainty on the Block Economic Value – a New Valuation Approach / Rola Czynnika Niepewności Przy Obliczaniu Wskaźnika Rentowności – Nowe Podejście , 2012 .

[5]  S. Ross,et al.  Option pricing: A simplified approach☆ , 1979 .

[6]  J. Hull Options, Futures, and Other Derivatives , 1989 .

[7]  N. Metropolis,et al.  The Monte Carlo method. , 1949 .

[8]  Peter Tufano,et al.  When are Real Options Exercised? An Empirical Study of Mine Closings , 2000 .

[9]  G. Davis,et al.  Valuing uncertain asset cash flows when there are no options: A real options approach , 2005 .

[10]  Eduardo S. Schwartz,et al.  Evaluating Natural Resource Investments , 1985 .

[11]  Majid Ataee-pour,et al.  Determination of the effect of operating cost uncertainty on mining project evaluation , 2012 .

[12]  Les Clewlow,et al.  Implementing derivatives models , 1998 .

[13]  Charles E. Clark,et al.  Monte Carlo , 2006 .

[14]  Raman Uppal,et al.  Valuing risk and flexibility: A comparison of methods , 1996 .

[15]  Erkan Topal,et al.  Adjusted Real Option Valuation to Maximise Mining Project Value - A Case Study Using Century Mine , 2009 .

[16]  L. Trigeorgis The Nature of Option Interactions and the Valuation of Investments with Multiple Real Options , 1993, Journal of Financial and Quantitative Analysis.