Simulation of Shovel-Truck Haulage Systems in Open-pit Mines by Considering Breakdown of Trucks and Crusher Capacity

This paper presents a case study that performed simulations on shovel-truck haulage systems in an open-pit mine by considering truck's breakdown and crusher's capacity. The SSangyoung limestone open-pit mine in Korea was selected as a study area and investigated to design the simulation algorithms. The GPSS/H simulation language is used to implement the simulation algorithms as a console application(simulator). The values of input parameters for simulator were measured by field investigation in the study area. The simulation results showed that 7 trucks can maximize the daily profit of haulage operations(i.e., 73,775 USD) when considers the frequency of trucks' breakdown as 1/40 hour -1 . In addition, the crusher capacity of 1300 tph is required to improve the efficiency of

[1]  L. D. Smith The argument for a bare bones base case , 1999 .

[2]  Marilena Cardu,et al.  Analysis of possible alternatives for the exploitation and hauling system in a marl mine (Tavernola BG, Italy) , 2004 .

[3]  Hong Zhang Multi-objective simulation-optimization for earthmoving operations , 2008 .

[4]  Boyoung Park,et al.  Creation of Vector Network Data with Considering Terrain Gradient for Analyzing Optimal Haulage Routes of Dump Trucks in Open Pit Mines , 2013 .

[5]  Yosoon Choi,et al.  Optimal haulage routing of off-road dump trucks in construction and mining sites using Google Earth and a modified least-cost path algorithm , 2011 .

[6]  Yosoon Choi Simulation of Shovel-Truck Haulage Systems by Considering Truck Dispatch Methods , 2013 .

[7]  Michel Gamache,et al.  Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines , 2001 .

[8]  Victor Amoako Temeng,et al.  A computerized model for truck dispatching in open pit mines , 1997 .

[9]  Atac Bascetin,et al.  Optimization of shovel-truck system for surface mining , 2009 .

[10]  C. Musingwini,et al.  Modelling open pit shovel-truck systems using the Machine Repair Model , 2007 .

[11]  G. H. Blackwell Estimation of large open pit haulage truck requirements , 1999 .

[12]  Kazem Oraee,et al.  Fuzzy Model for Truck Allocation in Surface Mines , 2004 .

[13]  Howard L. Hartman,et al.  Introductory Mining Engineering , 1987 .

[14]  Shangyao Yan,et al.  An optimal scheduling model for ready mixed concrete supply with overtime considerations , 2007 .