Simulation of Shovel-Truck Haulage Systems in Open-pit Mines by Considering Breakdown of Trucks and Crusher Capacity
暂无分享,去创建一个
[1] L. D. Smith. The argument for a bare bones base case , 1999 .
[2] Marilena Cardu,et al. Analysis of possible alternatives for the exploitation and hauling system in a marl mine (Tavernola BG, Italy) , 2004 .
[3] Hong Zhang. Multi-objective simulation-optimization for earthmoving operations , 2008 .
[4] Boyoung Park,et al. Creation of Vector Network Data with Considering Terrain Gradient for Analyzing Optimal Haulage Routes of Dump Trucks in Open Pit Mines , 2013 .
[5] Yosoon Choi,et al. Optimal haulage routing of off-road dump trucks in construction and mining sites using Google Earth and a modified least-cost path algorithm , 2011 .
[6] Yosoon Choi. Simulation of Shovel-Truck Haulage Systems by Considering Truck Dispatch Methods , 2013 .
[7] Michel Gamache,et al. Overview of Solution Strategies Used in Truck Dispatching Systems for Open Pit Mines , 2001 .
[8] Victor Amoako Temeng,et al. A computerized model for truck dispatching in open pit mines , 1997 .
[9] Atac Bascetin,et al. Optimization of shovel-truck system for surface mining , 2009 .
[10] C. Musingwini,et al. Modelling open pit shovel-truck systems using the Machine Repair Model , 2007 .
[11] G. H. Blackwell. Estimation of large open pit haulage truck requirements , 1999 .
[12] Kazem Oraee,et al. Fuzzy Model for Truck Allocation in Surface Mines , 2004 .
[13] Howard L. Hartman,et al. Introductory Mining Engineering , 1987 .
[14] Shangyao Yan,et al. An optimal scheduling model for ready mixed concrete supply with overtime considerations , 2007 .