Rework Impacts Evaluation Through System Dynamics Approach in Overlapped Product Development Schedule

This work aims to explore a novel framework to analyze the planning concepts in product development projects employing techniques to reduce the lead-time of activities, such as overlapping of a pair of each. With the System Dynamics methodology, a model to evaluate the rework fraction, needed to accommodate the deviations proportional to the overlapping grade of the activities, is developed. A numerical example is provided to demonstrate the validity of the model. Although problems encountered during the project management are dynamic, they have been treated on a static basis, what has as result, chronic schedules delays, overruns and cost overspent persist in follow the managers’ (re)actions. In this work, we have addressed this known problem by introducing and reviewing some characteristics of the concept of rework in overlapped schedules. This consists in observe and capture the relations feedbacks among the original planned project schedule, the overlapping strategy and the inherent uncertainty in a work being done with poor information. To realize this concept, we have faced with many behaviors patterns (e.g. rework, new duration, non-conformity), and analyze the output behavior pattern, produced by the proposed model.

[1]  Reza H. Ahmadi,et al.  Time-Cost Trade-Offs in Overlapped Product Development , 2000, Oper. Res..

[2]  Reza H. Ahmadi,et al.  Concurrent Crashing and Overlapping in Product Development , 2004, Oper. Res..

[3]  K. Sengupta,et al.  Alternative conceptions of feedback in dynamic decision environments: an experimental investigation , 1993 .

[4]  John D. Sterman,et al.  All models are wrong: reflections on becoming a systems scientist† , 2002 .

[5]  C. William Ibbs,et al.  Fast-Tracking's Impact on Project Change , 1998 .

[6]  Stuart E. Madnick,et al.  Software Project Dynamics: An Integrated Approach , 1991 .

[7]  Wanhua Qiu,et al.  An Approach to Measuring Coupled Tasks Strength and Sequencing of Coupled Tasks in New Product Development , 2006, Concurr. Eng. Res. Appl..

[8]  W. Zangwill,et al.  Toward a Theory of Continuous Improvement and the Learning Curve , 1998 .

[9]  Viswanathan Krishnan Design process improvement : sequencing and overlapping activities in product development , 1993 .

[10]  Fabio Nicolò,et al.  A concurrent engineering decision model: Management of the project activities information flows , 1998 .

[11]  Amiya K. Chakravarty,et al.  Overlapping design and build cycles in product development , 2001, Eur. J. Oper. Res..

[12]  John D. Sterman,et al.  System Dynamics Modeling for Project Management , 1992 .

[13]  John Bowers,et al.  The role of system dynamics in project management , 1996 .

[14]  Raad Yahya Qassim,et al.  Project Acceleration via Activity Crashing, Overlapping, and Substitution , 2008, IEEE Transactions on Engineering Management.

[15]  John D. Sterman,et al.  System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .

[16]  Evan L. Porteus,et al.  Optimal Timing of Reviews in Concurrent Design for Manufacturability , 1995 .

[17]  Viswanathan V Krishnan,et al.  Managing the simultaneous execution of coupled phases in concurrent product development , 1996 .

[18]  David N. Ford,et al.  The Liar's Club: Concealing Rework in Concurrent Development , 2003, Concurr. Eng. Res. Appl..

[19]  Christoph H. Loch,et al.  Communication and Uncertainty in Concurrent Engineering , 1998 .

[20]  Kim B. Clark,et al.  Product development performance : strategy, organization, and management in the world auto industry / Kim B. Clark, Tahahiro Fujimoto , 1991 .

[21]  Reza H. Ahmadi,et al.  Structuring product development processes , 2001, Eur. J. Oper. Res..

[22]  Chris Hendrickson,et al.  Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders , 1989 .

[23]  Steven D. Eppinger,et al.  A Model-Based Framework to Overlap Product Development Activities , 1997 .

[24]  Tyson R. Browning,et al.  Key concepts in modeling product development processes , 2006 .

[25]  Steven D. Eppinger,et al.  A simulation-based process model for managing complex design projects , 2005, IEEE Transactions on Engineering Management.

[26]  James M. Lyneis,et al.  Strategic management of complex projects: a case study using system dynamics , 2001 .