The University of Tokyo Atacama Observatory 6.5m telescope: project overview and current status

The University of Tokyo Atacama Observatory Project is to construct and operate a 6.5m infrared telescope at the summit of Co. Chajnantor (5640m altitude) in northern Chile, promoted by the Institute of Astronomy of the University of Tokyo. Thanks to the dry climate (PWV~0.5mm) and the high altitude, excellent observation condition in the NIR to MIR wavelengths is achieved. The telescope has two Nasmyth foci where two facility instruments, SWIMS for the near-infrared and MIMIZUKU for the mid-infrared, are installed and two folded- Cassegrain foci for carry-in instruments. All these four foci can be switched by rotating a tertiary mirror. The final focal ratio is 12.2 and the foci have large field-of-view of 25 arcmin in diameter. We adopted a 6.5-m F/1.25 light-weighted borosilicate honeycomb primary mirror and its support system that are developed by Steward Observatory Richard F. Caris Mirror Lab. An enclosure has the shape of carousel, and large ventilation windows with shutters control the wind to flush heat inside the enclosure. A support building with a control room, a mirror coating system and maintenance facilities is located at the side of the enclosure. The mirror coating system consists of a large aluminizing chamber and a mirror washing facility. The operation of the telescope will be remotely carried out from a base facility at San Pedro de Atacama, 50km away from the summit. Development of the two facility instruments has already been completed and they are transported to Hilo, Hawaii in 2017. We are going to carry out engineering observations of those instruments on the Subaru telescope for clearing up technical issues and verifying their performance. The existing summit access road from the ALMA concession area was laid in 2006, however, it is too narrow to carry large components of the telescope and the ancillary facilities such as the primary mirror, its cell, and the aluminizing chamber. The road is being expanded so that it has the width of <5m for straight portion and <7m for curved portion.. The telescope mount and the enclosure are being pre-assembled for functional and performance tests in Japan. All telescope system will be assembled at the summit and see the engineering first light early 2019.

[1]  Mamoru Doi,et al.  Development of a new mid-infrared instrument for the TAO 6.5-m Telescope , 2010, Astronomical Telescopes + Instrumentation.

[2]  Mamoru Doi,et al.  The University of Tokyo Atacama Observatory 6.5m Telescope: design of mirror coating system and its performances , 2016, Astronomical Telescopes + Instrumentation.

[3]  Mamoru Doi,et al.  MiniTAO/MAX38 first light: 30-micron band observations from the ground-based telescope , 2010, Astronomical Telescopes + Instrumentation.

[4]  Mamoru Doi,et al.  The University of Tokyo Atacama Observatory 6.5m telescope project , 2010, Astronomical Telescopes + Instrumentation.

[5]  Mamoru Doi,et al.  SITE CHARACTERISTICS OF THE SUMMIT OF CERRO CHAJNANTOR AT THE 5640 M ALTITUDE , 2011 .

[6]  Northern Chile,et al.  A Satellite Survey of Cloud Cover and Water Vapor in , 2001 .

[7]  Mamoru Doi,et al.  Design and development status of the University of Tokyo Atacama Observatory 6.5m telescope , 2014, Astronomical Telescopes and Instrumentation.

[8]  Y. Yoshii,et al.  Overview of University of Tokyo Atacama Observatory 6.5m telescope project , 2014, Astronomical Telescopes and Instrumentation.

[9]  Mamoru Doi,et al.  Development of MIMIZUKU: a mid-infrared multi-field imager for 6.5-m TAO telescope , 2012, Other Conferences.

[10]  Mamoru Doi,et al.  Design of mirror coating facility for The University of Tokyo Atacama Observatory 6.5m telescope , 2014, Astronomical Telescopes and Instrumentation.

[11]  Shigeyuki Sako,et al.  Development of an optical device (Field Stacker) for achieving accurate photometry in ground-based mid-infrared observations , 2016, Astronomical Telescopes + Instrumentation.

[12]  Mamoru Doi,et al.  Development status of the mid-infrared two-field camera and spectrograph MIMIZUKU for the TAO 6.5-m Telescope , 2016, Astronomical Telescopes + Instrumentation.

[13]  Mamoru Doi,et al.  Revised specifications and current development status of MIMIZUKU: the mid-infrared instrument for the TAO 6.5-m telescope , 2014, Astronomical Telescopes and Instrumentation.

[14]  Shigeyuki Sako,et al.  Array controller system with cryogenic pre-amplifiers for MIMIZUKU , 2016, Astronomical Telescopes + Instrumentation.

[15]  Mamoru Doi,et al.  The University of Tokyo Atacama 1.0-m Telescope , 2008, Astronomical Telescopes + Instrumentation.

[16]  Mamoru Doi,et al.  Development status of the simultaneous two-color near-infrared multi-object spectrograph SWIMS for the TAO 6.5m telescope , 2018, Astronomical Telescopes + Instrumentation.

[17]  Mamoru Doi,et al.  Laboratory performance evaluation of the mid-infrared camera and spectrograph MIMIZUKU for the TAO 6.5-m telescope , 2018, Astronomical Telescopes + Instrumentation.

[18]  Mamoru Doi,et al.  ANIR : Atacama Near-Infrared Camera for the 1.0-m miniTAO Telescope , 2015, 1502.00638.

[19]  Y. Yoshii,et al.  The University of Tokyo Atacama Observatory 6.5m telescope: project overview and current status , 2016, Astronomical Telescopes + Instrumentation.

[20]  Mamoru Doi,et al.  First Paschen alpha imaging from the ground: the first light of Atacama Near-Infrared Camera on the miniTAO 1m telescope , 2010, Astronomical Telescopes + Instrumentation.

[21]  Mamoru Doi,et al.  Evaluations of new atmospheric windows at thirty micron wavelengths for astronomy , 2012, Other Conferences.