Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags
暂无分享,去创建一个
[1] G. K. Koulinas,et al. A new tabu search-based hyper-heuristic algorithm for solving construction leveling problems with limited resource availabilities , 2013 .
[2] Miklós Hajdu,et al. Point-to-point Versus Traditional Precedence Relations for Modeling Activity Overlapping☆ , 2015 .
[3] Gul Polat,et al. Impacts of different objective functions on resource leveling in construction projects: a case study , 2014 .
[4] Rainer Kolisch,et al. PSPLIB - a project scheduling problem library , 1996 .
[5] Miklós Hajdu,et al. Investigation of Critical Activities in a Network with Point-to-point Relations , 2015 .
[6] Yin-Fu Huang,et al. Self-adaptive harmony search algorithm for optimization , 2010, Expert Syst. Appl..
[7] Hojjat Adeli,et al. Nature Inspired Computing: An Overview and Some Future Directions , 2015, Cognitive Computation.
[8] Zong Woo Geem,et al. A New Heuristic Optimization Algorithm: Harmony Search , 2001, Simul..
[9] Klaus Neumann,et al. Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints , 2000, Eur. J. Oper. Res..
[10] Junfeng Chen,et al. An improved fireworks algorithm with landscape information for balancing exploration and exploitation , 2015, 2015 IEEE Congress on Evolutionary Computation (CEC).
[11] José Luis Ponz-Tienda,et al. The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations , 2015, Comput. Aided Civ. Infrastructure Eng..
[12] Robert B. Harris. Packing Method for Resource Leveling (PACK) , 1990 .
[13] Andrés L. Medaglia,et al. Sustainable workforce scheduling in construction program management , 2013, J. Oper. Res. Soc..
[14] Sameh M. El-Sayegh,et al. Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting , 2011 .
[15] Said M. Easa,et al. Resource Leveling in Construction by Optimization , 1989 .
[16] Oscar Castillo,et al. A Harmony Search Algorithm Comparison with Genetic Algorithms , 2015, Fuzzy Logic Augmentation of Nature-Inspired Optimization Metaheuristics.
[17] Rainer Kolisch,et al. PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .
[18] Robert Blynn Harris,et al. Precedence and Arrow Networking Techniques for Construction , 1980 .
[19] Víctor Yepes,et al. The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm , 2013 .
[20] Peter J. Burman,et al. Precedence Networks for Project Planning and Control , 1972 .
[21] Rinaldo Rinaldi,et al. Optimal resource leveling using non-serial dyanamic programming , 1994 .
[22] Khaled A El-Rayes,et al. Optimizing Resource Leveling in Construction Projects , 2009 .
[23] Zong Woo Geem,et al. Generalised Adaptive Harmony Search: A Comparative Analysis of Modern Harmony Search , 2013, J. Appl. Math..
[24] Jürgen Zimmermann,et al. Exact methods for the resource levelling problem , 2011, J. Sched..
[25] David Arditi,et al. Resource Leveling in Line‐of‐Balance Scheduling , 2013, Comput. Aided Civ. Infrastructure Eng..
[26] Ajith Abraham,et al. An Improved Harmony Search Algorithm with Differential Mutation Operator , 2009, Fundam. Informaticae.
[27] Eugenio Pellicer,et al. A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags , 2017, Comput. Aided Civ. Infrastructure Eng..
[28] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[29] M. Fesanghary,et al. An improved harmony search algorithm for solving optimization problems , 2007, Appl. Math. Comput..
[30] Julia Rieck,et al. Mixed-integer linear programming for resource leveling problems , 2012, Eur. J. Oper. Res..
[31] H. N. Ahuja. Construction performance control by networks , 1976 .
[32] A. E. Eiben,et al. On Evolutionary Exploration and Exploitation , 1998, Fundam. Informaticae.
[33] Miklós Hajdu,et al. Continuous Precedence Relations for Better Modelling Overlapping Activities , 2015 .
[34] Erik Demeulemeester,et al. Minimizing resource availability costs in time-limited project networks , 1995 .