Composite indicator for railway infrastructure management
暂无分享,去创建一个
Uday Kumar | Diego Galar | Matthias Asplund | Stephen Mayowa Famurewa | Christer Stenström | U. Kumar | M. Asplund | D. Galar | S. Famurewa | C. Stenström
[1] Thomas L. Saaty,et al. DECISION MAKING WITH THE ANALYTIC HIERARCHY PROCESS , 2008 .
[2] Ashok Deshpande,et al. Fuzzy Description of Air Quality: A Case Study , 2011, RSKT.
[3] Lotfi A. Zadeh,et al. Outline of a New Approach to the Analysis of Complex Systems and Decision Processes , 1973, IEEE Trans. Syst. Man Cybern..
[4] Per Hokstad,et al. RAMS Management of Railway Tracks , 2008 .
[5] Stefano Tarantola,et al. Handbook on Constructing Composite Indicators: Methodology and User Guide , 2005 .
[6] Andy Neely,et al. Performance measurement system design , 1995 .
[7] A. Parida,et al. Maintenance performance indicators (MPIs) for benchmarking the railway infrastructure , 2009 .
[8] T. Ross. Fuzzy Logic with Engineering Applications , 1994 .
[9] Miguel A. Salido,et al. An Assessment of Railway Capacity , 2008 .
[10] S. Sivanandam,et al. Introduction to Fuzzy Logic using MATLAB , 2006 .
[11] Harald Krueger. Parametric modeling in rail capacity planning , 1999, WSC '99.
[12] William Ocampo-Duque,et al. Assessing water quality in rivers with fuzzy inference systems: a case study. , 2006, Environment international.
[13] A. Neely. The evolution of performance measurement research: Developments in the last decade and a research agenda for the next , 2005 .
[14] Basim Al-Najjar,et al. Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making , 2003 .
[15] M. Wahlborg,et al. Simulation Models: Important Aids ForBanverket's Planning Process , 1970 .
[16] Aditya Parida,et al. Performance Indicators of Railway Infrastructure , 2012 .
[17] Alex Landex,et al. Methods to estimate railway capacity and passenger delays , 2008 .
[18] Aditya Parida,et al. Development of a multi‐criteria hierarchical framework for maintenance performance measurement (MPM) , 2007 .