A rolling horizon stochastic programming approach for the integrated planning of production and utility systems

Abstract This study focuses on the operational and resource-constrained condition-based cleaning planning problem of integrated production and utility systems under uncertainty. For the problem under consideration, a two-stage scenario-based stochastic programming model that follows a rolling horizon modeling representation is introduced; resulting in a hybrid reactive-proactive planning approach. In the stochastic programming model, all the binary variables related to the operational status (i.e., startup, operating, shutdown, under online or offline cleaning) of the production and utility units are considered as first-stage variables (i.e., scenario independent), and most of the remaining continuous variables are second-stage variables (i.e., scenario dependent). In addition, enhanced unit performance degradation and recovery models due to the cumulative operating level deviation and cumulative operating times are presented. Terminal constraints for minimum inventory levels for utilities and products as well as maximum unit performance degradation levels are also introduced. Two case studies are presented to highlight the applicability and the particular features of the proposed approach as an effective means of dealing with the sophisticated integrated planning problem considered in highly dynamic environments.

[1]  Halil I. Cobuloglu,et al.  A two-stage stochastic mixed-integer programming approach to the competition of biofuel and food production , 2017, Comput. Ind. Eng..

[2]  Jung-Hua Wu,et al.  Two-stage stochastic programming model for the regional-scale electricity planning under demand uncertainty , 2016 .

[3]  Henokh Yernias Fibrianto,et al.  Thermal and hydraulic impacts consideration in refinery crude preheat train cleaning scheduling using recent stochastic optimization methods , 2016 .

[4]  El-Houssaine Aghezzaf,et al.  Selective maintenance optimization for systems operating missions and scheduled breaks with stochastic durations , 2017 .

[5]  Yifan Zhou,et al.  Maintenance optimisation of a parallel-series system with stochastic and economic dependence under limited maintenance capacity , 2016, Reliab. Eng. Syst. Saf..

[6]  Jong Min Lee,et al.  Multi-period energy planning model under uncertainty in market prices and demands of energy resources: A case study of Korea power system , 2016 .

[7]  Costas D. Maranas,et al.  A Two-Stage Modeling and Solution Framework for Multisite Midterm Planning under Demand Uncertainty , 2000 .

[8]  Ralf Gössinger,et al.  Condition-based release of maintenance jobs in a decentralised production-maintenance system – An analysis of alternative stochastic approaches , 2017 .

[9]  Nur I. Zulkafli,et al.  Planning of production and utility systems under unit performance degradation and alternative resource-constrained cleaning policies , 2016 .

[10]  Panagiotis D. Christofides,et al.  Smart plant operations: Vision, progress and challenges , 2007 .

[11]  Tahir Ekin,et al.  Integrated maintenance and production planning with endogenous uncertain yield , 2017, Reliab. Eng. Syst. Saf..

[12]  Nur I. Zulkafli,et al.  Integrated condition-based planning of production and utility systems under uncertainty , 2017 .

[13]  Efstratios N. Pistikopoulos,et al.  A rolling horizon optimization framework for the simultaneous energy supply and demand planning in microgrids , 2015 .

[14]  Lazaros G. Papageorgiou,et al.  A rolling horizon approach for optimal management of microgrids under stochastic uncertainty , 2017 .

[15]  Abdullatif Lacina Diaby,et al.  Optimization of scheduled cleaning of fouled heat exchanger network under ageing using genetic algorithm , 2016 .

[16]  Gonzalo Guillén-Gosálbez,et al.  Design and planning of infrastructures for bioethanol and sugar production under demand uncertainty , 2012 .

[17]  Malgorzata M. O'Reilly,et al.  Stochastic model for maintenance in continuously deteriorating systems , 2017, Eur. J. Oper. Res..