Production flow synchronisation versus buffer capacities in assembly systems

AbstrAct Purpose: The goal of the considerations carried-out in that paper is the determination of the system synchronisation conditions. Those conditions concern capacities of system buffers. The fulfilment of the developed conditions should guarantee the production flow synchronisation into the expected steady state determined by the system bottleneck. In analysed assembly system rhythmic concurrent production with wide assortment is realised. Design/methodology/approach: The considerations presented in that paper are rooted in the authority method called Requirements and Possibilities Balance Method (RPBM). The experiments in the computer simulations programmes have been carried-out within the confines of the researches. The computer simulation models of the assembly systems using Taylor II for Windows and Enterprise Dynamics have been built. Findings: There are two kinds of system buffers: the entrance buffers and the inter-resources buffers in the assembly systems. The interdependences informing about the required number of elements allocated into the system buffers in order to the production realisation during the first cycle of the system steady state has been formulated. Moreover, the minimal buffer capacities have been determined.

[1]  Patrick R. McMullen,et al.  Multi-objective assembly line balancing via a modified ant colony optimization technique , 2006 .

[2]  Rolf Dieter Schraft,et al.  Automation and Robotics , 2007 .

[3]  N. Hemachandra,et al.  Performance analysis and buffer allocations in some open assembly systems , 2003, Comput. Oper. Res..

[4]  Aleksander Gwiazda Multi-criterion analysis technique in a process of quality management , 2007 .

[5]  Janez Kopac,et al.  Implementation of cutting tool management system , 2007 .

[6]  Anna D. Dobrzańska-Danikiewicz The acceptation of the production orders for the realisation in the manufacturing assembly systems , 2006 .

[7]  Tadeusz Sawik,et al.  Hierarchical approach to production scheduling in make-to-order assembly , 2006 .

[8]  Damian Krenczyk,et al.  Required buffer capacities in assembly systems , 2007 .

[9]  D. Szewieczek,et al.  Integrated method of technological processes estimation in materials engineering , 2007 .

[10]  Magnus Wiktorsson,et al.  A note on the specification of assembly systems , 2000 .

[11]  B. Fidler,et al.  Modelling methodology for development of Virtual Organisation's supporting systems , 2007 .

[12]  Damian Krenczyk,et al.  The selection of the production route in the assembly system , 2006 .

[13]  A. Kania,et al.  Strategies of sustainable development in practice , 2007 .

[14]  B. Skołud,et al.  The requirements and possibilities balance method used for production planning in the manufacturing assembly systems , 2004 .

[15]  Hosang Jung,et al.  Heuristics for assembly operation scheduling problem in flexible assembly systems , 2006 .