Overlapping start-time bands in implicit tour scheduling
暂无分享,去创建一个
[1] John J. Bartholdi,et al. A Guaranteed-Accuracy Round-off Algorithm for Cyclic Scheduling and Set Covering , 1981, Oper. Res..
[2] L. W. Jacobs,et al. Labor Utilization Effects of Labor Scheduling Flexibility Alternatives in a Tour Scheduling Environment , 1993 .
[3] Jonathan F. Bard,et al. Solving large-scale tour scheduling problems , 1994 .
[4] Donald F. Rossin,et al. Sufficient working subsets for the tour scheduling problem , 1991 .
[5] Michael J. Showalter,et al. Simple Approaches to Shift, Days-Off and Tour Scheduling Problems , 1983 .
[6] Larry W. Jacobs,et al. A simulated annealing approach to the cyclic staff-scheduling problem , 1993 .
[7] Michael W. Carter,et al. Work Force Size and Single Shift Schedules with Variable Demands , 1985 .
[8] Stephen E. Bechtold,et al. Implicit modeling of flexible break assignments in optimal shift scheduling , 1990 .
[9] James E. Bailey,et al. Integrated days off and shift personnel scheduling , 1985 .
[10] George B. Dantzig,et al. Letter to the Editor - A Comment on Edie's "Traffic Delays at Toll Booths" , 1954, Oper. Res..
[11] Stephen E. Bechtold,et al. A METHODOLOGY FOR LABOR SCHEDULING IN A SERVICE OPERATING SYSTEM , 1987 .
[12] Stephen E. Bechtold,et al. Working set generation methods for labor tour scheduling , 1994 .
[13] Michael J. Brusco,et al. Improving Personnel Scheduling at Airline Stations , 1995, Oper. Res..
[14] Stephen E. Bechtold,et al. A Comparative Evaluation of Labor Tour Scheduling Methods , 1991 .
[15] Gary M. Thompson. Improved implicit optimal modeling of the labor shift scheduling problem , 1995 .