Prefabricated Technology in a Modular House

In view of the issue related to the demand of housing, the Philippine Government must find some alternative ways to lessen the expenses without altering the quality of the housing projects, the study paved the way to evaluate a comparison between the prefabricated housing components in modular house and the traditionally made housing components (CHB) in terms of cost, efficiency, effectiveness, and the time to spend during construction. It also attempts to search for the development and production of low cost housing, the end-users feedback and other institutions that used these materials and its impact to the market. One of the interesting insights in the study is that prefabricated components has a significance difference in terms of construction cost as compare to the traditional methods due to the materials, and fast and short time duration of construction.

[1]  Stefano Pampanin,et al.  Construction time and cost for post-tensioned timber buildings , 2009 .

[2]  Laura H. Ikuma,et al.  Effects of Lean Construction on Sustainability of Modular Homebuilding , 2012 .

[3]  Tomas U. Ganiron An Exploratory Study of the Impact and Construction of Billboards and Signage Structures , 2014 .

[4]  Chris I. Goodier,et al.  House-Building Business Models and Off-Site Construction Take-Up , 2012 .

[6]  Chi Sun Poon,et al.  The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector , 2009 .

[7]  Mohamed Al-Hussein,et al.  Development of Lean Model for House Construction Using Value Stream Mapping , 2009 .

[8]  A. K. Majumder,et al.  International Journal of Advanced Science and Technology , 2013 .

[9]  Javier Neila,et al.  Applications of Phase Change Material in highly energy-efficient houses , 2012 .

[10]  John Meiling,et al.  Defects in offsite construction: timber module prefabrication , 2009 .

[11]  Joseph Neelamkavil Automation in the Prefab and Modular Construction Industry , 2009 .

[12]  Alexandre Feigenbaum,et al.  Functional barriers in PET recycled bottles. Part I. Determination of diffusion coefficients in bioriented PET with and without contact with food simulants , 2004 .

[13]  Tomas U. Ganiron An Investigation of Moisture Performance of Sawdust and Banana Peels Ply board as Non-Veneer Panel , 2013 .

[14]  John B. Mander,et al.  Seismic Performance of Precast Reinforced and Prestressed Concrete Walls , 2003 .

[15]  H. Voordijk,et al.  Matching supply networks to a modular product architecture in the house-building industry , 2009 .

[16]  Yahya C. Kurama,et al.  Design of Hybrid Precast Concrete Walls for Seismic Regions , 2009 .

[18]  T. U. Ganiron Effects of Human Hair Additives in Compressive Strength of Asphalt Cement Mixture , 2014 .

[19]  Tomas U. Ganiron An Empirical Investigation on End-Users' Acceptance of Compressed Lahar Sediment Blocks as Wall Panel , 2014 .

[20]  C S Poon,et al.  Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong. , 2009, Waste management.