Resources and capacity: Lessons learned from post-disaster reconstruction resourcing in Indonesia, China and Australia

Post-disaster reconstruction poses resourcing challenges specific to the construction practitioners and requires constant improvements of the construction industry and of the environment in which it operates. By drawing on in-field surveys and observations in the disaster affected areas in Indonesia, China and Australia, the research examines their respective resourcing practice following a disaster with a particular focus on identifying the resource and capacity constraints that confronted the reconstruction practitioners in a post-disaster situation. This mapping exercise helps draw attention from decision makers and the construction sector to the vulnerable areas in post-disaster reconstruction and also generates lessons and experiences worthy of adoption in other disaster situations. Practical measures are suggested to improve the implementation of physical reconstruction through laws, regulations and policies, along with the according mechanisms in the industry and at a project level.

[1]  Paul K. Freeman,et al.  Allocation of post-disaster reconstruction financing to housing , 2004 .

[2]  Paul Steele,et al.  Post-Tsunami recovery : issues and challenges in Sri Lanka , 2006 .

[3]  Jean Hartley,et al.  Case study research , 2004 .

[4]  T. E. Russell The humanitarian relief supply chain : analysis of the 2004 South East Asia earthquake and Tsunami , 2005 .

[5]  R. Yin Case Study Research: Design and Methods , 1984 .

[6]  Suzanne Wilkinson,et al.  Building resilience by focusing on legal and contractual frameworks for disaster reconstruction , 2008 .

[7]  Theo Schilderman,et al.  Adapting traditional shelter for disaster mitigation and reconstruction: experiences with community-based approaches , 2004 .

[8]  Robert W. McGee An economic and ethical analysis of the Katrina disaster , 2008 .

[9]  David Bevan,et al.  Aid, Public Expenditure and Dutch Disease , 2003 .

[10]  Jack Hirshleifer,et al.  Some Thoughts on the Social Structure After a Bombing Disaster , 1956, World Politics.

[11]  Florian Steinberg,et al.  Housing reconstruction and rehabilitation in Aceh and Nias, Indonesia—Rebuilding lives☆ , 2007 .

[12]  W. M. Corden,et al.  BOOMING SECTOR AND DUTCH DISEASE ECONOMICS: SURVEY AND CONSOLIDATION , 1984 .

[13]  Sisira Jayasuriya,et al.  Reconstruction after a major disaster: Lessons from the post-Tsunami experience in Indonesia, Sri Lanka, and Thailand , 2008 .

[14]  C. Benson,et al.  Understanding the Economic and Financial Impacts of Natural Disasters , 2004 .

[15]  Suahasil Nazara,et al.  Aceh-Nias Reconstruction and Rehabilitation: Progress and Challenges at the End of 2006 , 2007 .

[16]  Mary C. Comerio,et al.  Disaster Hits Home: New Policy for Urban Housing Recovery , 1999 .