JIT Mixed-Model Sequencing Rules: Is There a Best One?
暂无分享,去创建一个
[1] Mullen,et al. JIT sequencing for mixed-model assembly lines with setups using Tabu Search , 1998 .
[2] Jeffrey W. Herrmann,et al. Generating Cyclic Fair Sequences using Aggregation and Stride Scheduling , 2007 .
[3] Randall P. Sadowski,et al. Simulation with Arena , 1998 .
[4] P. Schroeder. The Goal: A Process of Ongoing Improvement , 1994 .
[5] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[6] Rafael Pastor,et al. Minimising maximum response time , 2013, Comput. Oper. Res..
[7] J. J. Kanet. Minimizing the average deviation of job completion times about a common due date , 1981 .
[8] Saïd Salhi,et al. An adaptive search for the response time variability problem , 2012, J. Oper. Res. Soc..