Cost Effective Strategy for Track Stability and Extended Asset Life through Planned Timber Sleeper Retention

A case is presented for planned retention of existing serviceable timber sleepers as an alternative to replacement by new sleepers of any material. An example of a recently developed and proven resilient rail fastening system which stabilises existing distressed timber sleepered track, significantly reduces track maintenance and extends asset life is explained.