ECONOMIC PRODUCTION QUANTITY CONCERNING LEARNING AND THE REWORKING OF IMPERFECT ITEMS
暂无分享,去创建一个
[1] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[2] Leopoldo Eduardo Cárdenas-Barrón. Optimal manufacturing batch size with rework in a single-stage production system - A simple derivation , 2008, Comput. Ind. Eng..
[3] Jerome S. Osteryoung,et al. Use of the EOQ model for inventory analysis , 1986 .
[4] Mohamad Y. Jaber,et al. The dual-phase learning-forgetting model , 2002 .
[5] C. T. Ng,et al. Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables , 2007 .
[6] Maurice Bonney,et al. Economic manufacture quantity (EMQ) model with lot-size dependent learning and forgetting rates , 2007 .
[7] Huan Neng Chiu,et al. An optimal algorithm for solving the dynamic lot-sizing model with learning and forgetting in setups and production , 2005 .
[8] P. A. Hayek,et al. Production lot sizing with the reworking of imperfect quality items produced , 2001 .
[9] James R. Evans,et al. The unit learning curve approximation of total cost , 1987 .
[10] T. P. Wright,et al. Factors affecting the cost of airplanes , 1936 .
[11] Eginhard J. Muth,et al. Learning Effects in Economic Lot Sizing , 1983 .
[12] C. H. Kim,et al. An optimal production run length in deteriorating production processes , 1999 .
[13] Bhaba R. Sarker,et al. Optimal batch sizing in a multi-stage production system with rework consideration , 2008, Eur. J. Oper. Res..
[14] Y. Chiu. Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .
[15] Meir J. Rosenblatt,et al. Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .
[16] T.C.E. Cheng,et al. AN ECONOMIC PRODUCTION QUANTITY MODEL WITH LEARNING AND FORGETTING CONSIDERATIONS , 1994 .
[17] Mohamad Y. Jaber,et al. Mathematical modelling of the effect of human learning in the finite production inventory model , 1993 .
[18] Bhaba R. Sarker,et al. Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..
[19] Timothy L. Smunt,et al. A COMPARISON OF DIRECT COST SAVINGS BETWEEN FLEXIBLE AUTOMATION AND LABOR WITH LEARNING , 2000 .
[20] Timothy L. Urban. Analysis of production systems when run length influences product quality , 1998 .
[21] Maurice Bonney,et al. Lot sizing with learning and forgetting in set-ups and in product quality , 2003 .
[22] L. Argote,et al. Learning Curves in Manufacturing , 1990, Science.
[23] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[24] E. C. Keachie,et al. Effects of Learning on Optimal Lot Size , 1966 .
[25] Douglas J. Thomas,et al. The value of setup cost reduction and process improvement for the economic production quantity model with defects , 2006, Eur. J. Oper. Res..
[26] Udo Buscher,et al. Optimizing a production system with rework and equal sized batch shipments , 2007, Comput. Oper. Res..
[27] Abraham Mehrez,et al. Economic Production Lot Size Model with Variable Production Rate and Imperfect Quality , 1994 .
[28] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[29] George L. Adler,et al. The Effects of Learning on Optimal Lot Size Determination—Multiple Product Case , 1974 .
[30] Mohamad Y. Jaber,et al. Lot sizing for an imperfect production process with quality corrective interruptions and improvements, and reduction in setups , 2006, Comput. Ind. Eng..
[31] T.C.E. Cheng,et al. An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .
[32] Jeffrey D. Camm. A NOTE ON LEARNING CURVE PARAMETERS , 1985 .
[33] Salah E. Elmaghraby,et al. Economic manufacturing quantities under conditions of learning and forgetting (EMQ/LaF) , 1990 .
[34] Mohamad Y. Jaber,et al. Production , Manufacturing and Logistics Learning curves for processes generating defects requiring reworks , 2004 .
[35] Kuo-Lung Hou,et al. An EPQ model with setup cost and process quality as functions of capital expenditure , 2007 .
[36] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[37] Karl Inderfurth,et al. Lotsizing in a Production System with Rework and Product Deterioration , 2005, OR.
[38] Singa Wang Chiu,et al. Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns , 2007, Eur. J. Oper. Res..
[39] T. C. Edwin Cheng,et al. Batch scheduling of deteriorating reworkables , 2008, Eur. J. Oper. Res..