Deteriorating inventory model with finite production rate and two-level of credit financing for stochastic demand

An inventory model for deteriorating items with finite production rate and stochastic demand rate is developed when the supplier offers delay period to the retailer for due payment against purchases and the retailer in turn extends the trade credit offer to its customers. This policy of passing on of the credit period is well known as two-level of credit financing. Items in the system follow stochastic demand behavior that are produced with finite production rate and subjected to constant rate of deterioration. The model is developed with an objective to minimize total expected cost of retailer as it is assumed to be a dominant player in the supply chain. Necessary and sufficient conditions for existence and uniqueness of the optimal solution are obtained and established to minimize the retailer’s total expected cost. Results obtained are validated with the help of numerical examples. Sensitivity analysis of various parameters is carried out to gain meaningful managerial insights.

[1]  Yung-Fu Huang,et al.  The Replenishment Decision for EOQ Inventory Model under Permissible Delay in Payments , 2002 .

[2]  Nita H. Shah Probabilistic Order Level System when items in inventory Deteriorate and Delay in Payments is permissible , 2004, Asia Pac. J. Oper. Res..

[3]  Hardik N. Soni,et al.  An EOQ model tor deteriorating items with progressive payment scheme under DCF approach , 2006 .

[4]  Leopoldo Eduardo Cárdenas-Barrón,et al.  OPTIMAL ORDER SIZE TO TAKE ADVANTAGE OF A ONE-TIME DISCOUNT OFFER WITH ALLOWED BACKORDERS , 2010 .

[5]  Nita H. Shah,et al.  Eoq Model for Time-Dependent deterioration Rate with a temporary Price discount , 2005, Asia Pac. J. Oper. Res..

[6]  Nita H. Shah A Probabilistic Order Level System When Delay in Payment is Permissible , 1993 .

[7]  Nita H. Shah,et al.  A discrete-in-time probabilistic inventory model for deteriorating items under conditions of permissible delay in payments , 1998, Int. J. Syst. Sci..

[8]  Adrijit Goswami,et al.  Probabilistic EOQ model for deteriorating items under trade credit financing , 2009, Int. J. Syst. Sci..

[9]  Nita H. Shah Probabilistic order level system with lead time when delay in payments are permissible , 1997 .

[10]  Hui-Ming Wee,et al.  Economic order quantity model for deteriorating items with planned backorder level , 2011, Math. Comput. Model..

[11]  N. Shah Probabilistic time-scheduling model for an exponentially decaying inventory when delays in payments are permissible , 1993 .

[12]  S. Goyal Economic Order Quantity under Conditions of Permissible Delay in Payments , 1985 .

[13]  Leopoldo Eduardo Cárdenas-Barrón Optimal ordering policies in response to a discount offer: Corrections , 2009 .

[14]  Hardik N. Soni,et al.  Inventory models and trade credit: a review , 2010 .

[15]  Kun-Jen Chung The Inventory Replenishment Policy for Deteriorating Items Under Permissible Delay in Payments , 2000 .