IEC61850 implementation in localization of power substation automation system

Power substations automation plays a significant role in power network stability because it increases the validity and quality of substation operation and decreases error probability. Monitoring and visibility development has increased level and decision quality and finally reliability and system stability. Nowadays EEC61850 protocol is a newest and the most proper tool to perform power substation automation and powerhouses. This article presents methods to make a software program and use this protocol in a native automation system.

[1]  Olof M. Jarvegren,et al.  Pacific Northwest GridWise™ Testbed Demonstration Projects; Part I. Olympic Peninsula Project , 2008 .

[2]  Jong-Wha Chong,et al.  IEC 61850 Standard Based MMS Communication Stack Design Using OOP , 2012, 2012 26th International Conference on Advanced Information Networking and Applications Workshops.