Managing wind turbine reliability and maintenance via performance-based contract

Performance-based contracting (PBC) is reshaping the acquisition, operation, and maintenance of capital equipment. Under the PBC scheme, we propose a holistic approach for lowering the cost of wind turbine ownership while meeting the availability requirement. Our effects are focused on integrated firms who design and market wind turbines, and also provide maintenance and repair service. PBC differs from conventional service contracts in that the wind farmers compensate the service provider for the system performance, not the spare parts and repair labor. We explore the analytical relationship between system cost, reliability and spare parts stocking. This analytical insight into the system performance allows the turbine manufacturer to optimize design, production, and after-sales services. The study aims to create a theoretical basis to facilitate the transition of the maintenance paradigm from a material-based contract to a performance-based contract in the power industry.

[1]  Yi Ding,et al.  Optimal corrective maintenance contract planning for aging multi-state system , 2009 .

[2]  Peter Tavner,et al.  Condition monitoring and fault diagnosis of a wind turbine synchronous generator drive train , 2009 .

[3]  Jochen Giebhardt,et al.  Rotor Condition Monitoring for Improved Operational Safety of Offshore Wind Energy Converters , 2005 .

[4]  M. Shahidehpour,et al.  Power distribution asset management , 2006, 2006 IEEE Power Engineering Society General Meeting.

[5]  Tongdan Jin,et al.  Condition based maintenance optimization for wind power generation systems under continuous monitoring , 2011 .

[6]  Tongdan Jin,et al.  Managing performance based logistics by balancing reliability and spare parts stocking , 2011, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.

[7]  Geert-Jan van Houtum,et al.  Optimization of component reliability in the design phase of capital goods , 2010, Eur. J. Oper. Res..

[8]  C. C. Sherbrooke Multiechelon inventory systems with lateral supply , 1992 .

[9]  L. Bertling,et al.  A reliability-centered asset maintenance method for assessing the impact of maintenance in power distribution systems , 2005, IEEE Transactions on Power Systems.

[10]  Adamantios Mettas,et al.  Reliability allocation and optimization for complex systems , 2000, Annual Reliability and Maintainability Symposium. 2000 Proceedings. International Symposium on Product Quality and Integrity (Cat. No.00CH37055).

[11]  U. D. Kumar,et al.  Spares provisioning under performance-based logistics contract: profit-centric approach , 2008, J. Oper. Res. Soc..

[12]  Peter Tavner,et al.  Reliability analysis for wind turbines , 2007 .

[13]  Alex Gorod,et al.  A framework for performance based logistics: A system of systems approach , 2010, International Congress on Ultra Modern Telecommunications and Control Systems.

[14]  R. E. Brown,et al.  Managing the risk of performance based rates , 2000 .

[15]  Roy Billinton,et al.  Incorporating reliability index probability distributions in performance based regulation , 2002, IEEE CCECE2002. Canadian Conference on Electrical and Computer Engineering. Conference Proceedings (Cat. No.02CH37373).

[16]  A. Jacopino,et al.  Use of r&m measures in australian defence aerospace performance based contracts , 2006, RAMS '06. Annual Reliability and Maintainability Symposium, 2006..