On the Impact of Considering Power Losses in Offshore Wind Farm Cable Routing

Wind energy is a field of main importance in the transition away from fossil fuels. In order to achieve this goal, reducing production cost of wind energy is of primary importance, especially for offshore wind parks. In the present paper we illustrate optimization models to achieve this goal for the cable routing problem. In particular we focus on the economical impact of considering power losses in the optimization. The resulting optimization problem considers both minimizing immediate costs (CAPEX) and minimizing costs due to power losses in the park lifetime. Thanks to the close collaboration with a leading energy company, we have been able to conduct different what-if analyses on a set of existing wind parks. Having a fast and reliable tool to optimize cable routing considering or not power losses, we have been able, for the first time, to quantify the impact of these kinds of decisions at design phase. Our results illustrates the importance of considering power losses already at the design phase, as well as the importance of having a sophisticated optimization tool, compared with the traditional manual design.

[1]  Pierre Hansen,et al.  Special issue on mathematical contributions to metaheuristics editorial , 2009, J. Heuristics.

[2]  Alain Hertz,et al.  Optimizing the Design of a Wind Farm Collection Network , 2011, INFOR Inf. Syst. Oper. Res..

[3]  L. Johanning,et al.  Offshore wind farm electrical cable layout optimization , 2015 .

[4]  David Pisinger,et al.  Optimizing wind farm cable routing considering power losses , 2017, Eur. J. Oper. Res..

[5]  David Pisinger,et al.  On the Impact of using Mixed Integer Programming Techniques on Real-world Offshore Wind Parks , 2017, ICORES.

[6]  Yang Fu,et al.  Optimization of internal electric connection system of large offshore wind farm with hybrid genetic and immune algorithm , 2008, 2008 Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies.

[7]  Antonio Bolufé Röhler,et al.  Matheuristics: Optimization, Simulation and Control , 2009, Hybrid Metaheuristics.

[8]  Javier Serrano González,et al.  A review and recent developments in the optimal wind-turbine micro-siting problem , 2014 .

[9]  Peter Wall,et al.  Optimal Electric Network Design for a Large Offshore Wind Farm Based on a Modified Genetic Algorithm Approach , 2012, IEEE Systems Journal.

[10]  Joanna Bauer,et al.  The offshore wind farm array cable layout problem: a planar open vehicle routing problem , 2015, J. Oper. Res. Soc..

[11]  T. J. Overbye,et al.  A clustering based wind farm collector system cable layout design , 2011, 2011 IEEE Power and Energy Conference at Illinois.

[12]  Patrik Fagerfjäll,et al.  Optimizing wind farm layout - more bang for the buck using mixed integer linear programming , 2010 .

[13]  Zhe Chen,et al.  Optimisation of electrical system for offshore wind farms via genetic algorithm , 2009 .

[14]  Sourabh Dutta,et al.  Data mining and graph theory focused solutions to Smart Grid challenges , 2012 .

[15]  Peter Christiansen,et al.  Horns Rev Offshore Windfarm: Its Main Controller and Remote Control System , 2003 .

[16]  Amaro de Sousa,et al.  Optimal Cable Design of Wind Farms: The Infrastructure and Losses Cost Minimization Case , 2016, IEEE Transactions on Power Systems.