Hybrid simulation and MIP based heuristic algorithm for the production and distribution planning in the soft drink industry
暂无分享,去创建一个
Bilge Bilgen | Çağrı Sel | B. Bilgen | Ç. Sel
[1] Hartmut Stadtler,et al. Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows , 2003, Oper. Res..
[2] Arshinder,et al. Supply chain coordination: Perspectives, empirical studies and research directions , 2008 .
[3] Semra Tunali,et al. A hybrid approach for the capacitated lot sizing problem with setup carryover , 2012 .
[4] Alistair R. Clark,et al. Lot sizing and furnace scheduling in small foundries , 2008, Comput. Oper. Res..
[5] Josefa Mula,et al. Mathematical programming models for supply chain production and transport planning , 2010, Eur. J. Oper. Res..
[6] Horst Tempelmeier,et al. Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic , 2009, Comput. Oper. Res..
[7] Zuo-Jun Max Shen,et al. Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions , 2011, Eur. J. Oper. Res..
[8] M. D. Byrne,et al. Production planning: An improved hybrid approach , 2005 .
[9] Young Hae Lee,et al. Production-distribution planning in supply chain considering capacity constraints , 2002 .
[10] P. Tsiakis,et al. OPTIMAL PRODUCTION ALLOCATION AND DISTRIBUTION SUPPLY CHAIN NETWORKS , 2008 .
[11] Nafee Rizk,et al. Synchronized production–distribution planning in a single-plant multi-destination network , 2008, J. Oper. Res. Soc..
[12] Bilge Bilgen,et al. Integrated production and distribution planning in the fast moving consumer goods industry: a block planning application , 2010, OR Spectr..
[13] Raffaello Iavagnilio,et al. Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry , 2003 .
[14] Hartmut Stadtler,et al. A lot-sizing and scheduling model for multi-stage flow lines with zero lead times , 2013, Eur. J. Oper. Res..
[15] Sooyoung Kim,et al. Extended model for a hybrid production planning approach , 2001 .
[16] Young Hae Lee,et al. Production-distribution planning in supply chain using a hybrid approach , 2002 .
[17] Hyunbo Cho,et al. Hybrid algorithm for discrete event simulation based supply chain optimization , 2010, Expert Syst. Appl..
[18] Marte Fodstad,et al. Using and extending fix-and-relax to solve maritime inventory routing problems , 2013 .
[19] J. George Shanthikumar,et al. A Unifying View of Hybrid Simulation/Analytic Models and Modeling , 1983, Oper. Res..
[20] Yavuz Acar,et al. A decision support framework for global supply chain modelling: an assessment of the impact of demand, supply and lead-time uncertainties on performance , 2010 .
[21] Bilge Bilgen,et al. Application of fuzzy mathematical programming approach to the production allocation and distribution supply chain network problem , 2010, Expert Syst. Appl..
[22] Mustapha Ouhimmou,et al. Furniture supply chain tactical planning optimization using a time decomposition approach , 2008, Eur. J. Oper. Res..
[23] Claudio Fabiano Motta Toledo,et al. A hybrid multi-population genetic algorithm applied to solve the multi-level capacitated lot sizing problem with backlogging , 2013, Comput. Oper. Res..
[24] Li Zheng,et al. MIP-based fix-and-optimise algorithms for the parallel machine capacitated lot-sizing and scheduling problem , 2013 .
[25] Diego Klabjan,et al. Pricing, relaxing and fixing under lot sizing and scheduling , 2013, Eur. J. Oper. Res..
[26] Sheng-Jen Hsieh. Hybrid analytic and simulation models for assembly line design and production planning , 2002, Simul. Model. Pract. Theory.
[27] Mahdi Bashiri,et al. A NEW APPROACH TO TACTICAL AND STRATEGIC PLANNING IN PRODUCTION– DISTRIBUTION NETWORKS , 2012 .
[28] Laurence A. Wolsey,et al. Production Planning by Mixed Integer Programming , 2010 .
[29] Reinaldo Morabito,et al. Solution approaches for the soft drink integrated production lot sizing and scheduling problem , 2009, Eur. J. Oper. Res..
[30] Alistair R. Clark,et al. Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups , 2007, J. Heuristics.
[31] Yves Pochet,et al. A tighter continuous time formulation for the cyclic scheduling of a mixed plant , 2008, Comput. Chem. Eng..
[32] Laureano F. Escudero,et al. On solving the multi-period single-sourcing problem under uncertainty , 2006, Comput. Manag. Sci..
[33] Tan Miller,et al. Production and inter-facility transportation scheduling for a process industry , 2004, Eur. J. Oper. Res..
[34] Herbert Meyr,et al. Combining the principles of variable neighborhood decomposition search and the fix&optimize heuristic to solve multi-level lot-sizing and scheduling problems , 2013, Comput. Oper. Res..
[35] Jesus René Villalobos,et al. A tactical model for planning the production and distribution of fresh produce , 2011, Ann. Oper. Res..
[36] Awi Federgruen,et al. Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems , 2007, Oper. Res..
[37] Marianthi G. Ierapetritou,et al. Hybrid simulation based optimization approach for supply chain management , 2012, Comput. Chem. Eng..
[38] Bilge Bilgen,et al. Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling , 2013, Ann. Oper. Res..
[39] H. Romeijn,et al. A Lagrangean heuristic for integrated production and transportation planning problems in a dynamic, multi-item, two-layer supply chain , 2007 .
[40] Mohammad Mohammadi,et al. Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups , 2010, J. Intell. Manuf..
[41] John L. Mann,et al. Flowsheet decomposition heuristic for scheduling: a relax-and-fix method , 2004, Comput. Chem. Eng..
[42] Stefan Helber,et al. Dynamic capacitated lot sizing with random demand and dynamic safety stocks , 2013, OR Spectr..
[43] Bilge Bilgen,et al. Strategic tactical and operational production-distribution models: a review , 2004, Int. J. Technol. Manag..
[44] Mohamad Saeed Jabalameli,et al. Modeling the budget-constrained dynamic uncapacitated facility location-network design problem and solving it via two efficient heuristics: A case study of health care , 2013, Math. Comput. Model..
[45] Safia Kedad-Sidhoum,et al. MIP-based heuristics for multi-item capacitated lot-sizing problem with setup times and shortage costs , 2007, RAIRO Oper. Res..
[46] Laureano F. Escudero,et al. On SIP algorithms for minimizing the mean-risk function in the multi-period single-source problem under uncertainty , 2009, Ann. Oper. Res..
[47] Ross J. W. James,et al. Single and parallel machine capacitated lotsizing and scheduling: New iterative MIP-based neighborhood search heuristics , 2011, Comput. Oper. Res..
[48] Patrizia Beraldi,et al. Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs , 2008, Comput. Oper. Res..
[49] Reza Zanjirani Farahani,et al. A review and critique on integrated production–distribution planning models and techniques , 2013 .
[50] Kerem Akartunali,et al. A heuristic approach for big bucket multi-level production planning problems , 2009, Eur. J. Oper. Res..
[51] T. Drezner,et al. Competitive supply chain network design: An overview of classifications, models, solution techniques and applications , 2014 .
[52] M. D. Byrne,et al. Production planning using a hybrid simulation – analytical approach , 1999 .
[53] Stefan Helber,et al. A Fix-and-Optimize Approach for the Multi-Level Capacitated Lot Sizing Problems , 2010 .
[54] A. Ruszczynski,et al. On the integrated production, inventory, and distribution routing problem , 2006 .
[55] F. Jolai,et al. Integrated multi-site production-distribution planning in supply chain by hybrid modelling , 2010 .
[56] Richard F. Hartl,et al. Simulation and optimization of supply chains: alternative or complementary approaches? , 2009, OR Spectr..
[57] Wu Zhang,et al. On practical resource allocation for production planning and scheduling with period overlapping setups , 1994 .
[58] Marianthi G. Ierapetritou,et al. Supply chain management using an optimization driven simulation approach , 2013 .