Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology

This paper addresses the problem of scheduling activities in projects with stochastic activity durations. The aim is to determine for each activity a gate—a time before it the activity cannot begin. Setting these gates is analogous to setting inventory levels in the news vendor problem. The resources required for each activity are scheduled to arrive according to its gate. Since activities’ durations are stochastic, the start and finish time of each activity is uncertain. This fact may lead to one of two outcomes: (1) an activity is ready to start its processing as all its predecessors have finished, but it cannot start because the resources required for it were scheduled to arrive at a later time. (2) The resources required for the activity have arrived and are ready to be used but the activity is not ready to start because of precedence constraints. In the first case we will incur a “holding” cost while in the second case, we will incur a “shortage” cost. Our objective is to set gates so as to minimize the sum of the expected holding and shortage costs. We employ the Cross-Entropy method to solve the problem. The paper describes the implementation of the method, compares its results to various heuristic methods and provides some insights towards actual applications.

[1]  Avraham Shtub,et al.  Managing Stochastic, Finite Capacity, Multi-Project Systems through the Cross-Entropy Methodology , 2005, Ann. Oper. Res..

[2]  N. Zeev,et al.  Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process , 1999 .

[3]  Salah E. Elmaghraby,et al.  Optimal start times under stochastic activity durations , 2000 .

[4]  M. Krishnamoorthy,et al.  CRITICAL PATH METHOD: A REVIEW , 1968 .

[5]  Erik Demeulemeester,et al.  Project network models with discounted cash flows a guided tour through recent developments , 1997, Eur. J. Oper. Res..

[6]  Avraham Shtub,et al.  Project Management: Processes, Methodologies, and Economics , 1994 .

[7]  Dirk P. Kroese,et al.  Application of the Cross-Entropy Method to the Buffer Allocation Problem in a Simulation-Based Environment , 2005, Ann. Oper. Res..

[8]  Dan Trietsch Optimal feeding buffers for projects or batch supply chains by an exact generalization of the newsvendor result , 2006 .

[9]  Rainer Kolisch,et al.  Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .

[10]  Erik Demeulemeester,et al.  Resource-constrained project scheduling: A survey of recent developments , 1998, Comput. Oper. Res..

[11]  Salah E. Elmaghraby On the optimal release time of jobs with random processing times, with extensions to other criteria , 2001 .

[12]  Boaz Golany,et al.  Controlling shop floor operations in a multi-family, multi-cell manufacturing environment through constant work-in-process , 1999 .

[13]  Dirk P. Kroese,et al.  The Cross-Entropy Method for Continuous Multi-Extremal Optimization , 2006 .

[14]  Dan Trietsch,et al.  Economically Balanced Criticalities for Robust Project Scheduling and Control , 2005 .

[15]  Alf Kimms,et al.  Mathematical Programming and Financial Objectives for Scheduling Projects , 2007 .

[16]  Dirk P. Kroese,et al.  Global likelihood optimization via the cross-entropy method with an application to mixture models , 2004, Proceedings of the 2004 Winter Simulation Conference, 2004..

[17]  Meir J. Rosenblatt,et al.  Activity Delay in Stochastic Project Networks , 1997, Oper. Res..

[18]  U Dave,et al.  Critical Chain , 1998, J. Oper. Res. Soc..

[19]  Rema Padman,et al.  An integrated survey of deterministic project scheduling , 2001 .

[20]  Graham K. Rand Critical chain: the theory of constraints applied to project management , 2000 .

[21]  D. Malcolm,et al.  Application of a Technique for Research and Development Program Evaluation , 1959 .

[22]  Salah E. Elmaghraby,et al.  Activity networks: Project planning and control by network models , 1977 .

[23]  Erik Demeulemeester,et al.  Project scheduling : a research handbook , 2002 .

[24]  Erik Demeulemeester,et al.  FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING , 1972 .

[25]  Lih-Yuan Deng,et al.  The Cross-Entropy Method: A Unified Approach to Combinatorial Optimization, Monte-Carlo Simulation, and Machine Learning , 2006, Technometrics.

[26]  Willy Herroelen,et al.  Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..

[27]  Joseph G. Szmerekovsky,et al.  Scheduling projects with stochastic activity duration to maximize expected net present value , 2009, Eur. J. Oper. Res..

[28]  Eric V. Denardo,et al.  Dynamic Programming: Models and Applications , 2003 .