Proposição de um modelo para análise dos fatores de risco em projetos de implantação da metodologia lean Proposition of a model for the evaluation of risk factors in lean methodology project implementation

Managing risks associated with lean methodology implementation is important in order to overcome the low success rate for such projects. This paper presents three main contributions to this subject: (i) identification of risk factors of lean methodology implementation projects, (ii) degree of relationship between the factors identified, and (iii) algorithm for estimating the probability of a successful lean methodology project implementation, considering the type of factors and the degree of relationship between them. The model proposed was based on literature review and views of experts from academia and industry. It uses principles of reliability, in which the risk factors are modeled as a series-parallel system. The model tested in three companies showed results consistent with the uncertainties and risks of such projects. In addition, it identified the project critical risk factors considering the synergy between the factors.

[1]  K. Artto,et al.  Project strategy: strategy types and their contents in innovation projects , 2008 .

[2]  Uma Jogulu,et al.  Mixed methods: a research design for management doctoral dissertations , 2011 .

[3]  Rainer Seidel,et al.  A project contingency framework based on uncertainty and its consequences , 2010 .

[4]  R. Yin Case Study Research: Design and Methods , 1984 .

[5]  Colin Herron,et al.  The transfer of selected lean manufacturing techniques from Japanese automotive manufacturing into general manufacturing (UK) through change agents , 2008 .

[6]  K. Jeyaraman,et al.  A conceptual framework for critical success factors of lean Six Sigma , 2010 .

[7]  Davide Aloini,et al.  Risk management in ERP project introduction: Review of the literature , 2007, Inf. Manag..

[8]  Rolf Olsson,et al.  In search of opportunity management: Is the risk management process enough? , 2007 .

[9]  Mary A. Malina,et al.  Lessons Learned: Advantages and Disadvantages of Mixed Methods Research , 2010 .

[10]  J. W. Rogers,et al.  Implementing lean production systems: barriers to change , 2008 .

[11]  Marvin Rausand,et al.  System Reliability Theory: Models, Statistical Methods, and Applications , 2003 .

[12]  Edna Lúcia da Silva,et al.  Metodologia da pesquisa e elaboração de dissertação , 2001 .

[13]  Charles David Ray,et al.  THE LEAN INDEX: OPERATIONAL "LEAN" METRICS FOR THE WOOD PRODUCTS INDUSTRY , 2007 .

[14]  Mahmoud Houshmand,et al.  An extended model of design process of lean production systems by means of process variables , 2006 .

[15]  Z. M. Udin,et al.  Supply chain management from the perspective of value chain flexibility: an exploratory study , 2011 .

[16]  Todd A. Boyle,et al.  Lean, take two! Reflections from the second attempt at lean implementation , 2009 .

[17]  Jonathan I Levy,et al.  Science and Decisions: Advancing Risk Assessment , 2010, Risk analysis : an official publication of the Society for Risk Analysis.

[18]  Yuji Yamamoto,et al.  Fundamental mindset that drives improvements towards lean production , 2010 .

[19]  Suresh Garg,et al.  Development of index for measuring leanness: study of an Indian auto component industry , 2010 .

[20]  Jordi Olivella,et al.  Work organisation practices for lean production , 2008 .

[21]  Terje Aven,et al.  Perspectives on risk: review and discussion of the basis for establishing a unified and holistic approach , 2005, Reliab. Eng. Syst. Saf..

[22]  J. Karlsen Project owner involvement for information and knowledge sharing in uncertainty management , 2010 .

[23]  Pius Achanga,et al.  Critical success factors for lean implementation within SMEs , 2006 .

[24]  Elmar Kutsch,et al.  THESIS RESEARCH REPORT NOTE The effect of intervening conditions on the management of project risk , 2008 .

[25]  Dennis F. X. Mathaisel,et al.  A lean architecture for transforming the aerospace maintenance, repair and overhaul (MRO) enterprise , 2005 .

[26]  Rapinder Sawhney,et al.  A modified FMEA approach to enhance reliability of lean systems , 2010 .

[27]  Ernest Jordan,et al.  Top management support: mantra or necessity? , 2008 .

[28]  Alton Yeow-Kuan Chua,et al.  The mismanagement of knowledge management , 2005, Aslib Proc..

[29]  Ofer Zwikael,et al.  Top management involvement in project management. Exclusive support practices for different project scenarios , 2008 .

[30]  Hare Krishna,et al.  Estimation of reliability characteristics of general system configuration , 2008 .

[31]  G. Azzone,et al.  The organizational dynamics of Enterprise Risk Management , 2010 .

[32]  Shahram Taj,et al.  LEAN MANUFACTURING PERFORMANCE IN CHINA: ASSESSMENT OF 65 MANUFACTURING PLANTS , 2008 .

[33]  M. Naim,et al.  Evaluating the causes of uncertainty in logistics operations , 2010 .

[34]  Katsuki Aoki,et al.  Transferring Japanese kaizen activities to overseas plants in China , 2008 .

[35]  Jennifer Blackhurst,et al.  A model for inbound supply risk analysis , 2006, Comput. Ind..

[36]  Ravi Shankar,et al.  Creating flex-lean-agile value chain by outsourcing: An ISM-based interventional roadmap , 2008, Bus. Process. Manag. J..

[37]  J. Antonakis,et al.  Could lean production job design be intrinsically motivating? Contextual, configurational, and levels-of-analysis issues , 2006 .

[38]  G. Anand,et al.  Selection of lean manufacturing systems using the analytic network process – a case study , 2009 .

[39]  Catherine M. Beise,et al.  Do project managers practice what they preach, and does it matter to project success? , 2010 .

[40]  Thomas F. Gattiker,et al.  Understanding project champions’ ability to gain intra-organizational commitment for environmental projects , 2010 .

[41]  J. Worley,et al.  The role of communication and management support in a lean manufacturing implementation , 2006 .

[42]  Sandy Q. Qu,et al.  The qualitative research interview , 2011 .

[43]  Rambabu Kodali,et al.  Application of benchmarking for assessing the lean manufacturing implementation , 2009 .

[44]  Euthemia Stavrulaki,et al.  Aligning products with supply chain processes and strategy , 2010 .

[45]  Ofer Zwikael,et al.  Top management involvement in project management: A cross country study of the software industry , 2008 .

[46]  Paul Forrester,et al.  A model for evaluating the degree of leanness of manufacturing firms , 2002 .

[47]  R. Eugene Goodson,et al.  Read a plant-fast , 2002 .

[48]  Lynn Crawford,et al.  Fundamental uncertainties in projects and the scope of project management , 2006 .

[49]  Bob Gregory,et al.  Management directed kaizen: Toyota's Jishuken process for management development , 2010 .