First Experimental Results from the European Union 2-MW Coaxial Cavity ITER Gyrotron Prototype

Abstract The European Union is working toward providing 2-MW, coaxial-cavity, continuous-wave (cw) 170-GHz gyrotrons for ITER. Their design is based on results from an experimental preprototype tube having a pulse length of several milliseconds, in operation at Forschungszentrum Karlsruhe (FZK) for several years now. The first industrial prototype tube was designed for cw operation but, in a first phase, aimed at a pulse length of 1 s at the European Gyrotron Test Facility in Lausanne, Switzerland, as part of a phased testing/development program (1 s, 60 s, cw). The first experimental results of the operation of this prototype gyrotron are reported here. The microwave generation was characterized at very short pulse length (<0.01 s) using a load on loan from FZK, and the highest measured output power was 1.4 MW, at a beam energy significantly lower than the design value (83 kV instead of 90 kV), limited by arcing in the tube. The radio-frequency (rf) beam profile was measured to allow reconstruction of the phase and amplitude profile at the window and to provide the necessary information permitting proper alignment of the compact rf loads prior to pulse extension. Arcs in the tube limited the pulse length extension to a few tens of milliseconds. According to present planning, the tube is going to be opened, inspected, and refurbished, depending on the results of the inspection, to allow testing of an improved version of the mode launcher and replacement of some subassemblies.

[1]  M. Thumm,et al.  Improved launcher/mode converter for coaxial cavity ITER gyrotron , 2008, 2008 IEEE 35th International Conference on Plasma Science.

[2]  J. Vomvoridis,et al.  The self-consistent 3D trajectory electrostatic code ARIADNE for gyrotron beam tunnel simulation , 2004, Infrared and Millimeter Waves, Conference Digest of the 2004 Joint 29th International Conference on 2004 and 12th International Conference on Terahertz Electronics, 2004..

[3]  S. Alberti,et al.  Infrared Measurements of the RF Output of 170-GHz/2-MW Coaxial Cavity Gyrotron and Its Phase Retrieval Analysis , 2009, IEEE Transactions on Plasma Science.

[4]  William Bin,et al.  High-Power Millimeter-Wave Calorimetric Beam Absorbers , 2008 .

[5]  S. Alberti,et al.  Beam profile measurements of the output microwave beam of 2MW/170GHz coaxial-cavity gyrotron for ITER , 2008, 2008 IEEE 35th International Conference on Plasma Science.

[6]  G. Dammertz,et al.  A 2-MW, 170-GHz coaxial cavity gyrotron , 2004, IEEE Transactions on Plasma Science.

[7]  P. L. Mondino,et al.  Development of a 2-MW, CW Coaxial Gyrotron at 70 GHz and Test Facility for ITER , 2005 .