Monitoring of Construction Performance Using Daily Progress Photograph Logs and 4D As-Planned Models

[1]  David Arditi,et al.  Construction scheduling and progress control using geographical information systems , 2006 .

[2]  Daniel G. Aliaga,et al.  Sea of images , 2002, IEEE Visualization, 2002. VIS 2002..

[3]  Burcu Akinci,et al.  The Need for Prompt Schedule Update by Utilizing Reality Capture Technologies: A Case Study , 2005 .

[4]  Sheryl Staub-French,et al.  Requirements For A Mobile Interactive Workspace To Support Design Development And Coordination , 2006 .

[5]  Richard Szeliski,et al.  Modeling the World from Internet Photo Collections , 2008, International Journal of Computer Vision.

[6]  Silvio Savarese,et al.  3D generic object categorization, localization and pose estimation , 2007, 2007 IEEE 11th International Conference on Computer Vision.

[7]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[8]  Cordelia Schmid,et al.  A Comparison of Affine Region Detectors , 2005, International Journal of Computer Vision.

[9]  Steven M. Seitz,et al.  Photo tourism: exploring photo collections in 3D , 2006, ACM Trans. Graph..

[10]  David G. Lowe,et al.  Distinctive Image Features from Scale-Invariant Keypoints , 2004, International Journal of Computer Vision.

[11]  Mani Golparvar-Fard,et al.  Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs , 2009 .

[12]  Jianzhong Zhang,et al.  Using Scanning Lasers for Real-Time Pavement Thickness Measurement , 2005 .

[13]  Rafael Sacks,et al.  Assessing research issues in Automated Project Performance Control (APPC) , 2007 .

[14]  David Nistér,et al.  An efficient solution to the five-point relative pose problem , 2004, IEEE Transactions on Pattern Analysis and Machine Intelligence.

[15]  Carlos H. Caldas,et al.  Management and analysis of unstructured construction data types , 2008, Adv. Eng. Informatics.

[16]  Youssef M A Hashash,et al.  Integration of Construction As-Built Data Via Laser Scanning with Geotechnical Monitoring of Urban Excavation , 2006 .

[17]  Osama Moselhi,et al.  Integrating 3D laser scanning and photogrammetry for progress measurement of construction work , 2008 .