Cost analysis for heavy equipment in earthfill work – An optimization of heavy equipment fleet (Case study: Jabung ring dike project)
暂无分享,去创建一个
Earth fill work with large volumes of soil deposits will involve a lot of heavy equipment with a variety of functions and with different objectives. Where each machine will have different productivity anyway. So that in this paper discusses the calculation of the cost required to do the compacted earthfill work for embankment in accordance with the volume of work, the target date for implementation, and the number of heavy equipment needs. As the cost calculations used heavy equipment rental price per hour. In the cost analysis calculations use heavy equipment here there are several factors that we included in the calculation, are: 1.)Hauling distance; 2.)Effective hour a day; 3.)Change factor of Soil Volume; 4.)Effective Speed; 5.)Equipment efficiency factor; 6.)Equipment coefficient; 7.)Cycle Time.
[1] Wulfram I. Ervianto,et al. Manajemen proyek konstruksi , 2002 .
[2] Ng Eng Juan. Standar akuntansi keuangan , 2009 .
[3] J. Scott Armstrong,et al. Principles of forecasting , 2001 .