Cyclic Scheduling of Operations for a Part Type in an FMS Handled by a Single Robot: A Parametric Critical-Path Approach

AbstractWe consider two problems of periodic scheduling of parts in a robotic production system functioning under a given repetitive robot's route. The objective is to determine the starting times and durations of processing operations so as to minimize the cycle length. We reduce the problems to finding parametric critical paths in networks with varying arc lengths. In contrast to previously known methods, which solve these cyclic scheduling problems in cubic time, the parametric network approach solves the problems in $$O(m^2 {\text{ log }}m) $$ time, m being the problem size.

[1]  Zelda B. Zabinsky,et al.  An algorithm for scheduling a chemical processing tank line , 1993 .

[2]  J. van de Klundert Scheduling problems in automated manufacturing , 1996 .

[3]  I. B. Turksen,et al.  Crane Scheduling Problems , 1981 .

[4]  Hirofumi Matsuo,et al.  Crane scheduling problem in a computer-integrated manufacturing environment , 1991 .

[5]  Lei Lei Determining the optimal starting times in a cyclic schedule with a given route , 1993, Comput. Oper. Res..

[6]  Walter Ukovich,et al.  A Mathematical Model for Periodic Scheduling Problems , 1989, SIAM J. Discret. Math..

[7]  François Soumis,et al.  Schedule efficiency in a robotic production cell , 1995 .

[8]  Henry L. W. Nuttle,et al.  Hoist Scheduling For A PCB Electroplating Facility , 1988 .

[9]  J. Quadrat,et al.  A linear-system-theoretic view of discrete-event processes , 1983, The 22nd IEEE Conference on Decision and Control.

[10]  Richard M. Karp,et al.  A characterization of the minimum cycle mean in a digraph , 1978, Discret. Math..

[11]  Richard M. Karp,et al.  Parametric shortest path algorithms with an application to cyclic staffing , 1981, Discret. Appl. Math..

[12]  L. W. Phillips,et al.  Mathematical Programming Solution of a Hoist Scheduling Program , 1976 .

[13]  L. Lei,et al.  DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINE , 1994 .

[14]  Kathryn E. Stecke,et al.  Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .

[15]  Michael Pinedo,et al.  Scheduling: Theory, Algorithms, and Systems , 1994 .

[16]  Wieslaw Kubiak,et al.  Sequencing of parts and robot moves in a robotic cell , 1989 .