Monte Carlo simulation for schedule risks

Research was undertaken to assist practitioners in undertaking Monte Carlo simulation of project schedules. A probabilistic model was developed to translate project characteristics into schedule risk boundaries. This model has been tested in several projects and performed very well. Lessons learned during the application of Monte Carlo simulation to a large project are discussed.

[1]  J. K. Yates Construction Decision Support System for Delay Analysis , 1993 .

[2]  Edward R. Fisk Construction Project Administration , 1978 .

[3]  S. Abourizk,et al.  STATISTICAL PROPERTIES OF CONSTRUCTION DURATION DATA , 1992 .

[4]  S. Ogunlana,et al.  Construction delays in a fast-growing economy: Comparing Thailand with other economies , 1996 .

[5]  W. M. Ng,et al.  SIMULATION MODELING AND MANAGEMENT OF LARGE BASEMENT CONSTRUCTION PROJECT , 1998 .

[6]  Alexander Laufer,et al.  Factors Affecting Construction‐Planning Outcomes , 1990 .

[7]  John R. Baldwin,et al.  Causes of Delay in the Construction Industry , 1971 .

[8]  Daud Nasir Probabilistic analysis of schedule risks for building construction , 2000 .

[9]  Anthony D. Songer,et al.  PROJECT CHARACTERISTICS FOR SUCCESSFUL PUBLIC-SECTOR DESIGN-BUILD , 1997 .

[10]  John Christian,et al.  Effects of Delay Times on Production Rates in Construction , 1995 .

[11]  Gareth Vaughan Williams Fast Track Pros and Cons: Considerations for Industrial Projects , 1995 .

[12]  Brenda McCabe,et al.  Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model , 2003 .

[13]  Daniel C. Okpala,et al.  Causes of High Costs of Construction in Nigeria , 1988 .

[14]  Simaan M. AbouRizk,et al.  BELIEF NETWORKS FOR CONSTRUCTION PERFORMANCE DIAGNOSTICS , 1998 .

[15]  Jimmie Hinze,et al.  Analysis of fatalities recorded by OSHA , 1995 .

[16]  H. Randolph Thomas,et al.  Quantitative Effects of Construction Changes on Labor Productivity , 1995 .

[17]  Finn Verner Jensen,et al.  Introduction to Bayesian Networks , 2008, Innovations in Bayesian Networks.

[18]  A. Uchechukwu Elinwa,et al.  Construction Cost Factors in Nigeria , 1993 .

[19]  D. R. Friedrich,et al.  Revisions, repairs, and rework on large projects , 1987 .

[20]  Ronald McCaffer,et al.  FACTORS OF NON-EXCUSABLE DELAYS THAT INFLUENCE CONTRACTORS' PERFORMANCE , 1998 .