Plans of Control, Measurement and Monitoring with Risk Assessment Application to Rehabilitation works

Abstract The sector of the rehabilitation of buildings is developed in a growing context and of great demand in the rigor and ability in the management of production is a necessary condition for providing the best service and product to the customer, being an essential condition for maximizing profitability of construction activities. Defects and reworks should not be accepted as inevitable or even as certainties, but considered as a permanent challenge to the management of the work, being important to use risk assessment techniques in the planning and control of operations. The purpose of this article is to present a methodology for the elaboration of Control, Measurement and Monitoring Plans, within the framework of the production processes of a rehabilitation work, where it is necessary to ensure compliance with technical and regulatory requirements, based on the thinking on the associated risks. It is argued that this methodology has application and can contribute in reducing the variability and uncertainty of defects and reworks associated with the production of building rehabilitation works.