Personnel assignment for assembly production with worker differences
暂无分享,去创建一个
[1] Giovanni Mummolo,et al. The effect of dynamic worker behavior on flow line performance , 2009 .
[2] John A. Buzacott,et al. The impact of worker differences on production system output , 2002 .
[3] Albert Corominas,et al. Balancing assembly line with skilled and unskilled workers , 2008 .
[4] L COHEN,et al. Time study and the fundamental nature of manual skill. , 1946, Journal of Consulting Psychology.
[5] Carlos Andrés,et al. Branch and bound procedures for solving the Assembly Line Worker Assignment and Balancing Problem: Application to Sheltered Work centres for Disabled , 2008, Discret. Appl. Math..