A comprehensive framework for evaluating key project requirements

AbstractRequirements definition affects work performed in subsequent phases of a project. Thus, the compliance with requirements is crucial to the success of a project. The primary objective of this research was to develop a comprehensive framework for evaluating key building project requirements. The second objective was to identify and prioritize important project requirement using the analytical network process (ANP). The third objective was to examine the impact of requirement completeness on project success using structural equation model (SEM) analysis. A four-phase approach was employed to achieve the goals. The results suggest that building programming and site information have a higher priority in requirement definition than project control, project strategy, and project design parameter. The findings also indicate that requirement completeness may contribute significantly to building project success in terms of schedule success, cost success, quality performance, and overall benefit.

[1]  Awad S. Hanna,et al.  Effect of Preconstruction Planning Effort on Sheet Metal Project Performance , 2010 .

[2]  G. Edward Gibson,et al.  Project Success Index for Capital Facility Construction Projects , 1999 .

[3]  Akintola Akintoye,et al.  Project risk management practice: The case of a South African utility company , 2008 .

[4]  Per Sundström Organizing for progress and creativity in a new product development project , 2005 .

[5]  J. Nunnally Psychometric Theory (2nd ed), New York: McGraw-Hill. , 1978 .

[6]  Mihály Görög A comprehensive model for planning and controlling contractor cash-flow , 2009 .

[7]  Frederick P. Brooks,et al.  No Silver Bullet: Essence and Accidents of Software Engineering , 1987 .

[8]  Agata Czarnigowska,et al.  Analysis of supply system models for planning construction project logistics , 2005 .

[9]  Gregory A. Howell,et al.  MANAGING THE DECISION-MAKING PROCESS DURING PROJECT PLANNING , 1999 .

[10]  Edward W. Merrow,et al.  Understanding the Outcomes of Mega-Projects: A Quantitative Analysis of Very Large Civilian Projects , 1995 .

[11]  Adnan Adas,et al.  Predicting the level of organizational effectiveness: a methodology for the construction firm , 1996 .

[12]  S. Tamer Cavusgil,et al.  Decomposing the effects of market knowledge competence in new product export , 2000 .

[13]  R. Müller,et al.  Matching the project manager’s leadership style to project type , 2007 .

[14]  Sung-Lin Hsueh,et al.  Customer behavior and decision making in the refurbishment industry‐a data mining approach , 2010 .

[15]  Zohar Laslo Project portfolio management: An integrated method for resource planning and scheduling to minimize planning/scheduling-dependent expenses , 2010 .

[16]  James C. Anderson,et al.  STRUCTURAL EQUATION MODELING IN PRACTICE: A REVIEW AND RECOMMENDED TWO-STEP APPROACH , 1988 .

[17]  E. Westerveld,et al.  The Project Excellence Model®: linking success criteria and critical success factors , 2003 .

[18]  G. E. Gibson,et al.  Benchmarking Preproject Planning Effort , 1996 .

[19]  Roy C. Schmidt,et al.  MANAGING DELPHI SURVEYS USING NONPARAMETRIC STATISTICAL TECHNIQUES , 1997 .

[20]  Syed M. Ahmed,et al.  Use of Quality Function Deployment in Civil Engineering Capital Project Planning , 2003 .

[21]  John Kelsey,et al.  What do construction project planners do , 2005 .

[22]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .

[23]  G. E. Gibson,et al.  Preproject-Planning Process for Capital Facilities , 1995 .

[24]  Young Hoon Kwak,et al.  Managing risks in mega defense acquisition projects: Performance, policy, and opportunities , 2009 .

[25]  G. Edward Gibson,et al.  Scope Management Using Project Definition Rating Index , 1997 .

[26]  Rolph E. Anderson,et al.  Multivariate data analysis with readings (2nd ed.) , 1986 .

[27]  Rolph E. Anderson,et al.  Multivariate Data Analysis (7th ed. , 2009 .

[28]  Didar Zowghi Does Global Software Development Need a Different Requirements Engineering Process , 2007 .

[29]  Irem Dikmen Ozdoganm,et al.  A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects , 2000 .

[30]  Mark S. Litwin,et al.  How to Measure Survey Reliability and Validity , 1995 .

[31]  Linda V. Knight,et al.  Effect of a virtual project team environment on communication-related project risk , 2010 .

[32]  R. Keller,et al.  Technology-Information Processing Fit and the Performance of R&D Project Groups: A Test of Contingency Theory , 1994 .

[33]  Richard L. Tucker,et al.  The relative impacts of selected practices on project cost and schedule , 2005 .

[34]  Ming-Lang Tseng,et al.  Evaluating the effectiveness of e-learning system in uncertainty , 2011, Ind. Manag. Data Syst..

[35]  Daniela E. Damian,et al.  An Empirical Study of the Complex Relationships between Requirements Engineering Processes and Other Processes that Lead to Payoffs in Productivity, Quality, and Risk Management , 2006, IEEE Transactions on Software Engineering.

[36]  Ludovic-Alexandre Vidal,et al.  Measuring project complexity using the Analytic Hierarchy Process , 2011 .

[37]  G. Edward Gibson,et al.  Building Project Scope Definition Using Project Definition Rating Index , 2001 .

[38]  Dragan Bjelica,et al.  Measuring Project Success in Project-Oriented , 2013 .

[39]  Rolph E. Anderson,et al.  Multivariate data analysis (4th ed.): with readings , 1995 .

[40]  Karlos Artto,et al.  What is project strategy , 2007 .

[41]  J. Herbsleb,et al.  A systematic survey of CMM experience and results , 1996, Proceedings of IEEE 18th International Conference on Software Engineering.

[42]  E. Larson,et al.  Organizing for product development projects , 1988 .

[43]  R. Bagozzi Evaluating Structural Equation Models with Unobservable Variables and Measurement Error: A Comment , 1981 .

[44]  Olusegun O. Faniran,et al.  Structural equation model of project planning effectiveness , 2005 .

[45]  R. Sitgreaves Psychometric theory (2nd ed.). , 1979 .

[46]  Kassim Gidado ENHANCING THE PRIME CONTRACTOR'S PRE-CONSTRUCTION PLANNING , 2004 .

[47]  Edward G. Carmines,et al.  Reliability and Validity Assessment , 1979 .

[48]  Ibrahim M. Mahdi,et al.  Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP) , 2005 .

[49]  Gilbert A. Churchill,et al.  Marketing Research: Methodological Foundations , 1976 .

[50]  M. Browne,et al.  Alternative Ways of Assessing Model Fit , 1992 .

[51]  David Heesom,et al.  Trends of 4D CAD applications for construction planning , 2004 .

[52]  Jieh-Haur Chen,et al.  Requirements Definition and Management Practice to Improve Project Outcomes , 2012 .

[53]  Thomas L. Saaty,et al.  Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .

[54]  Andrzej Materka Research Methodology (1) , 2013 .

[55]  Kenneth King Humphreys,et al.  Control and Management of Capital Projects , 1965 .

[56]  Simon Washington,et al.  Structural equation model of construction contract dispute potential , 2000 .

[57]  Reijo Sulonen,et al.  Implementing requirements engineering processes throughout organizations: success factors and challenges , 2004, Inf. Softw. Technol..

[58]  Suzanne D. Pawlowski,et al.  The Delphi method as a research tool: an example, design considerations and applications , 2004, Inf. Manag..

[59]  June M. Verner,et al.  Case study: factors for early prediction of software development success , 2002, Inf. Softw. Technol..

[60]  Mladen Radujković,et al.  Application of key performance indicators in South‐Eastern European construction , 2010 .

[61]  Patrick Y. K. Chau,et al.  Reexamining a Model for Evaluating Information Center Success Using a Structural Equation Modeling Approach , 1997 .

[62]  Ammar Peter Kaka,et al.  The effects of the variability of project planning on cost commitment curves: a case study , 2003 .

[63]  J. S. Long,et al.  Testing Structural Equation Models , 1993 .

[64]  Richard P. Bagozzi,et al.  Assessing Construct Validity in Organizational Research , 1991 .

[65]  G. E. Gibson,et al.  Alignment during preproject planning , 2001 .

[66]  Stephen O. Ogunlana,et al.  Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects , 2010 .

[67]  Jyh-Bin Yang,et al.  Causes of Delay in the Planning and Design Phases for Construction Projects , 2010 .