PID Controlled Adaptive Time-Stepping in Coupled Surface-Subsurface Simulation: A Tool for Reducing Non-Physical Oscillation

[1]  Michael G. Edwards,et al.  Preconditioned Newton Methods for Fully Coupled Reservoir and Surface Facility Models , 1998 .

[2]  Mengdi Gao,et al.  Reservoir and Surface Facilities Coupled Through Partially and Fully Implicit Approaches , 2014 .

[3]  K. H. Coats,et al.  An Efficient Model for Evaluating Gas Field Gathering System Design , 1971 .

[4]  Kassem Ghorayeb,et al.  A General Purpose Controller for Coupling Multiple Reservoir Simulations and Surface Facility Networks , 2003 .

[5]  D. W. Peaceman Interpretation of Well-Block Pressures in Numerical Reservoir Simulation(includes associated paper 6988 ) , 1978 .

[6]  Jianping Chen,et al.  A Novel IPR Calculation Technique to Reduce Oscillations in Time-Lagged Network-Reservoir Coupled Modeling Using Analytical Scaling and Fast Marching Method , 2017 .

[7]  Ehtesham M. Hayder,et al.  Production Optimization through Coupled Facility-Reservoir Simulation , 2006 .

[8]  James P. Brill,et al.  A Study of Two-Phase Flow in Inclined Pipes , 1973 .

[9]  Baris Guyaguler,et al.  Near-Well-Subdomain Simulations for Accurate Inflow-Performance-Relationship Calculation To Improve Stability of Reservoir/Network Coupling , 2011 .

[10]  Gustaf Söderlind,et al.  Adaptive Time-Stepping and Computational Stability , 2006 .

[11]  R. Mark Nelms,et al.  An experimental evaluation of the PID controller represented by the delta operator , 2012, 2012 Proceedings of IEEE Southeastcon.

[12]  M. L. Litvak,et al.  Surface Network and Well Tubinghead Pressure Constraints in Compositional Simulation , 1995 .

[13]  Wade A. Bard,et al.  Integration of a Field Surface and Production Network With a Reservoir Simulator , 1997 .

[14]  Papsrpsarapprowd Fob,et al.  A Generalized Well-Management Scheme for Reservoir Simulation , 1996 .

[15]  Hoi Yeung,et al.  Severe Slugging Control Through Open Loop Unstable PID Tuning to Increase Oil Production , 2009 .

[16]  Aidan O'Dwyer,et al.  Handbook of PI and PID controller tuning rules , 2003 .

[17]  A. S. Emanuel,et al.  Studies of Offshore Reservoir With an Interfaced Reservoir/Piping Network Simulator , 1981 .

[18]  Denis José Schiozer,et al.  Use of Domain Decomposition for Simultaneous Simulation of Reservoir and Surface Facilities , 1994 .

[19]  Pierre Samier,et al.  A Fully Coupled Network Model, Practical Issues and Comprehensive Comparison with Other Integrated Models on Field Cases , 2015, ANSS 2015.

[20]  B. Rubin,et al.  A Semi-Implicit Approach for Integrated Reservoir and Surface-Network Simulation , 2014 .

[21]  E. Hairer,et al.  Solving Ordinary Differential Equations I , 1987 .

[22]  M. D. Trick,et al.  A Different Approach to Coupling a Reservoir Simulator with a Surface Facilities Model , 1998 .

[23]  Akhil Datta-Gupta,et al.  Fast-Marching Methods for Complex Grids and Anisotropic Permeabilities: Application to Unconventional Reservoirs , 2013, ANSS 2013.

[24]  Baris Guyaguler,et al.  Integrated Optimization of Field Development, Planning, and Operation , 2006 .

[25]  Alvaro L. G. A. Coutinho,et al.  Control strategies for timestep selection in simulation of coupled viscous flow and heat transfer , 2002 .

[26]  J. W. Watts,et al.  A Generalized Wellbore and Surface Facility Model, Fully Coupled to a Reservoir Simulator , 2004 .

[27]  Eduardo Gildin,et al.  A Control Perspective to Adaptive Time Stepping in Reservoir Simulation , 2017 .

[28]  H. Rieke Petroleum production systems: By M.J. Economides, A.D. Hill and C. Ehlig-Economides. PTR Prentice Hall, Englewood Cliffs, NJ, 1995, 611 pp , 1996 .

[29]  Thomas F. Russell Stability Analysis and Switching Criteria for Adaptive Implicit Methods Based on the CFL Condition , 1989 .