PID Controlled Adaptive Time-Stepping in Coupled Surface-Subsurface Simulation: A Tool for Reducing Non-Physical Oscillation
暂无分享,去创建一个
[1] Michael G. Edwards,et al. Preconditioned Newton Methods for Fully Coupled Reservoir and Surface Facility Models , 1998 .
[2] Mengdi Gao,et al. Reservoir and Surface Facilities Coupled Through Partially and Fully Implicit Approaches , 2014 .
[3] K. H. Coats,et al. An Efficient Model for Evaluating Gas Field Gathering System Design , 1971 .
[4] Kassem Ghorayeb,et al. A General Purpose Controller for Coupling Multiple Reservoir Simulations and Surface Facility Networks , 2003 .
[5] D. W. Peaceman. Interpretation of Well-Block Pressures in Numerical Reservoir Simulation(includes associated paper 6988 ) , 1978 .
[6] Jianping Chen,et al. A Novel IPR Calculation Technique to Reduce Oscillations in Time-Lagged Network-Reservoir Coupled Modeling Using Analytical Scaling and Fast Marching Method , 2017 .
[7] Ehtesham M. Hayder,et al. Production Optimization through Coupled Facility-Reservoir Simulation , 2006 .
[8] James P. Brill,et al. A Study of Two-Phase Flow in Inclined Pipes , 1973 .
[9] Baris Guyaguler,et al. Near-Well-Subdomain Simulations for Accurate Inflow-Performance-Relationship Calculation To Improve Stability of Reservoir/Network Coupling , 2011 .
[10] Gustaf Söderlind,et al. Adaptive Time-Stepping and Computational Stability , 2006 .
[11] R. Mark Nelms,et al. An experimental evaluation of the PID controller represented by the delta operator , 2012, 2012 Proceedings of IEEE Southeastcon.
[12] M. L. Litvak,et al. Surface Network and Well Tubinghead Pressure Constraints in Compositional Simulation , 1995 .
[13] Wade A. Bard,et al. Integration of a Field Surface and Production Network With a Reservoir Simulator , 1997 .
[14] Papsrpsarapprowd Fob,et al. A Generalized Well-Management Scheme for Reservoir Simulation , 1996 .
[15] Hoi Yeung,et al. Severe Slugging Control Through Open Loop Unstable PID Tuning to Increase Oil Production , 2009 .
[16] Aidan O'Dwyer,et al. Handbook of PI and PID controller tuning rules , 2003 .
[17] A. S. Emanuel,et al. Studies of Offshore Reservoir With an Interfaced Reservoir/Piping Network Simulator , 1981 .
[18] Denis José Schiozer,et al. Use of Domain Decomposition for Simultaneous Simulation of Reservoir and Surface Facilities , 1994 .
[19] Pierre Samier,et al. A Fully Coupled Network Model, Practical Issues and Comprehensive Comparison with Other Integrated Models on Field Cases , 2015, ANSS 2015.
[20] B. Rubin,et al. A Semi-Implicit Approach for Integrated Reservoir and Surface-Network Simulation , 2014 .
[21] E. Hairer,et al. Solving Ordinary Differential Equations I , 1987 .
[22] M. D. Trick,et al. A Different Approach to Coupling a Reservoir Simulator with a Surface Facilities Model , 1998 .
[23] Akhil Datta-Gupta,et al. Fast-Marching Methods for Complex Grids and Anisotropic Permeabilities: Application to Unconventional Reservoirs , 2013, ANSS 2013.
[24] Baris Guyaguler,et al. Integrated Optimization of Field Development, Planning, and Operation , 2006 .
[25] Alvaro L. G. A. Coutinho,et al. Control strategies for timestep selection in simulation of coupled viscous flow and heat transfer , 2002 .
[26] J. W. Watts,et al. A Generalized Wellbore and Surface Facility Model, Fully Coupled to a Reservoir Simulator , 2004 .
[27] Eduardo Gildin,et al. A Control Perspective to Adaptive Time Stepping in Reservoir Simulation , 2017 .
[28] H. Rieke. Petroleum production systems: By M.J. Economides, A.D. Hill and C. Ehlig-Economides. PTR Prentice Hall, Englewood Cliffs, NJ, 1995, 611 pp , 1996 .
[29] Thomas F. Russell. Stability Analysis and Switching Criteria for Adaptive Implicit Methods Based on the CFL Condition , 1989 .